Inspections for the day of: Wednesday, September 26, 2018.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-00824 General Inspection9/26/20189/26/20189/27/2018 2:20:29 PM CANC
ESC18-01075 Site Final9/26/20189/26/20189/27/2018 8:18:40 AMPPASS
site is final. Mike inspected the project yesterday and contact me. He said the only thing left was an excavator but everything else was gone and no construction.Phone #: ###-#### Inspection requested via web by Eldon Oyadomari

Staging area cleaned up, no loose dirt or material left in ROW.
ESC17-01652 General Inspection9/26/20189/26/20189/26/2018 3:55:04 PM PASS
ESC18-00264 BMP Violation9/26/20189/26/20189/26/2018 2:55:54 PMPFAIL
Invalid RP listed for project. Request to homeowner GC to get certified.
ESC18-01160 Random Inspection9/26/20189/26/20189/26/2018 2:37:20 PMPFAIL
WIP on excavating new basement under exisiting historic home. Large stockpiles onsite with no perimeter sediment control. Storm drain directly in front site does not have inlet sediment protection.

Verbal corrections request to remodel contractor to return call for ESC conference
ESC15-00306 Site Final9/26/20189/26/20189/26/2018 8:11:32 AMAPASS
First phase of ESP and Whitewater Park are complete. Second phase now in progress, see ESC18-01121 for coverage and ESC inspections. No further inspections on this permit, no corrective actions outstanding, ESC permit conditions satisfied.
ESC15-00306 General Inspection9/26/20189/26/20189/26/2018 8:09:46 AM CANC
ESC17-00027 Site Final9/5/20189/26/20189/25/2018 8:09:03 AMACANC
site final already complete