ESC17-00013
| General Inspection | 9/27/2018 | 9/27/2018 | 9/28/2018 3:23:55 PM | | CANC |
|
|
|
ESC17-01286
| Aging Inspection | 9/27/2018 | 9/27/2018 | 9/28/2018 3:23:23 PM | | CANC |
|
|
|
ESC16-01560
| General Inspection | 9/27/2018 | 9/27/2018 | 9/28/2018 3:23:17 PM | | CANC |
|
|
|
ESC18-01171
| Complaint Inspection | 9/27/2018 | 9/27/2018 | 9/28/2018 3:00:26 PM | P | PEND |
|
|
complaint of rude and messy concrete workers. No crews onsite, no trackout or discharges.
Reported issue to RP. On site conference scheduled with RP for Monday to address some corrections.
|
ESC18-00462
| BMP Violation | 9/26/2018 | 9/27/2018 | 9/27/2018 12:40:43 PM | A | PEND |
|
|
invalid RP for site; follow up on corrections.
GC to have counterpart/son become RP for this project and on Sherman. Follow inspection at site is tomorrow AM.
|
ESC18-00264
| BMP Violation | 9/27/2018 | 9/27/2018 | 9/27/2018 12:25:22 PM | P | PEND |
|
|
GC Jeff called to state that his counterpart will enroll in RP class and become certified and designated RP for their projects on Sherman and Highland View.
|
ESC18-01160
| BMP Violation | 9/26/2018 | 9/27/2018 | 9/27/2018 12:24:32 PM | P | PEND |
|
|
GC called to say that they will install sediment protection on storm drain, remove excess dirt and then install perimeter protection as needed.
Compliance extended to 9/28 PM
|
ESC17-01346
| General Inspection | 9/27/2018 | 9/27/2018 | 9/27/2018 12:21:51 PM | P | PASS |
|
|
Vertical construction in progress. Perimeter is clean, no trackout, discharges, or loose materials. Storm drains have sediment protection. Approved.
|
ESC17-01688
| General Inspection | 9/27/2018 | 9/27/2018 | 9/27/2018 12:17:01 PM | | PASS |
|
|
WIP on frame of apt buildings. Road work complete. Area has been swept. Approved
|
ESC17-01756
| General Inspection | 9/27/2018 | 9/27/2018 | 9/27/2018 11:57:56 AM | | FAIL |
|
|
Unmaintained construction entrance. Wrong type of rock. Hudson street is being swept but the dirt on Federal Way and Targee has been in street and gutter for weeks. Receiving storm drains do not have sediment protection.
Must be cleaned up by end of day 9-28
Correction notice to RP JC with Petra
|
ESC17-01757
| General Inspection | 9/27/2018 | 9/27/2018 | 9/27/2018 11:57:44 AM | | FAIL |
|
|
Unmaintained construction entrance. Wrong type of rock. Hudson street is being swept but the dirt on Federal Way and Targee has been in street and gutter for weeks. Receiving storm drains do not have sediment protection.
Must be cleaned up by end of day 9-28
Correction notice to RP JC with Petra
|
ESC17-01754
| BMP Violation | 9/27/2018 | 9/27/2018 | 9/27/2018 11:57:25 AM | P | FAIL |
|
|
Unmaintained construction entrance. Wrong type of rock. Hudson street is being swept but the dirt on Federal Way and Targee has been in street and gutter for weeks. Receiving storm drains do not have sediment protection.
Must be cleaned up by end of day 9-28
Correction notice to RP JC with Petra
|
ESC16-01278
| General Inspection | 9/27/2018 | 9/27/2018 | 9/27/2018 11:35:55 AM | P | PASS |
|
|
Only 3 lots in subdivision left. No loose trash. Subdivision BMPs (washout and DI bags) are installed for remaining construction. Harding Homes contact Ron was on site cleaning and stated streets are to be swept this evening.
|
ESC17-01512
| Site Final | 9/27/2018 | 9/27/2018 | 9/27/2018 11:31:09 AM | P | PASS |
|
|
Home complete and landscaped. Harding Homes has two more lots in subdivision phase. DI bags ok to remain. Subdivision is in good condition, trash contained. No trackout/discharges. This ESC permit finaled.
|
ESC18-00116
| Site Final | 9/27/2018 | 9/27/2018 | 9/27/2018 11:30:37 AM | P | PASS |
|
|
Home complete and landscaped. Harding Homes has two more lots in subdivision phase. DI bags ok to remain. Subdivision is in good condition, trash contained. No trackout/discharges. This ESC permit finaled.
|
ESC17-01516
| Site Final | 9/27/2018 | 9/27/2018 | 9/27/2018 11:30:23 AM | P | PASS |
|
|
Home complete and landscaped. Harding Homes has two more lots in subdivision phase. DI bags ok to remain. Subdivision is in good condition, trash contained. No trackout/discharges. This ESC permit finaled.
|
ESC18-00189
| Site Final | 9/27/2018 | 9/27/2018 | 9/27/2018 11:29:58 AM | P | PASS |
|
|
Home complete and landscaped. Harding Homes has two more lots in subdivision phase. DI bags ok to remain. Subdivision is in good condition, trash contained. No trackout/discharges. This ESC permit finaled.
|
ESC18-00188
| Site Final | 9/27/2018 | 9/27/2018 | 9/27/2018 11:29:08 AM | P | PASS |
|
|
Home complete and landscaped. Harding Homes has two more lots in subdivision phase. DI bags ok to remain. Subdivision is in good condition, trash contained. No trackout/discharges. This ESC permit finaled.
|
ESC17-01614
| Site Final | 9/27/2018 | 9/27/2018 | 9/27/2018 11:28:32 AM | P | PASS |
|
|
Home complete and landscaped. Harding Homes has two more lots in subdivision phase. DI bags ok to remain. Subdivision is in good condition, trash contained. No trackout/discharges. This ESC permit finaled.
|
ESC18-00058
| Site Final | 9/27/2018 | 9/27/2018 | 9/27/2018 11:27:41 AM | P | PASS |
|
|
Home complete and landscaped. Harding Homes has two more lots in subdivision phase. DI bags ok to remain. Subdivision is in good condition, trash contained. No trackout/discharges. This ESC permit finaled.
|
ESC17-01613
| Site Final | 9/27/2018 | 9/27/2018 | 9/27/2018 11:27:20 AM | P | PASS |
|
|
Home complete and landscaped. Harding Homes has two more lots in subdivision phase. DI bags ok to remain. Subdivision is in good condition, trash contained. No trackout/discharges. This ESC permit finaled.
|
ESC17-01609
| Site Final | 9/27/2018 | 9/27/2018 | 9/27/2018 11:26:56 AM | P | PASS |
|
|
Home complete and landscaped. Harding Homes has two more lots in subdivision phase. DI bags ok to remain. Subdivision is in good condition, trash contained. No trackout/discharges. This ESC permit finaled.
|
ESC17-00422
| Site Final | 9/27/2018 | 9/27/2018 | 9/27/2018 11:14:23 AM | P | PASS |
|
|
DI bags on Vista and Canal have been removed as requested. ESC permit conditions satisfied. Permit finaled.
|
ESC18-00786
| Random Inspection | 9/27/2018 | 9/27/2018 | 9/27/2018 10:47:57 AM | A | PASS |
|
|
WIP on frame. Trash contained. No trackout. Approved.
|
ESC18-00708
| Random Inspection | 9/27/2018 | 9/27/2018 | 9/27/2018 10:47:42 AM | P | PASS |
|
|
WIP on frame. Trash contained. No trackout. Approved.
|
ESC17-01540
| Site Final | 9/27/2018 | 9/27/2018 | 9/27/2018 10:47:02 AM | P | PASS |
|
|
Demo complete. Now new SFH in progress, see ESC18-00786
|