Inspections for the day of: Thursday, September 29, 2016.
Number of inspections: 33
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-01161 General Inspection9/28/20169/29/20169/30/2016 11:09:43 AMACANC
ESC15-00957 General Inspection9/28/20169/29/20169/30/2016 10:46:54 AMAPASS
Numerous SFHs in progress permitted seperately. No subdivion work remaining. DI bags installed. Concrete washout provided. No discharges or trackout from subdivision.
ESC16-00381 General Inspection9/29/20169/29/20169/30/2016 10:06:08 AM PASS
Earth disturbance complete and stabilized. Pool installed. ESC permit finaled.
ESC15-00541 General Inspection9/29/20169/29/20169/29/2016 2:56:22 PM PASS
ESC16-00410 Aging Inspection9/29/20169/29/20169/29/2016 2:24:46 PM PASS
Remodel complete. No construction activity or materials on site. No disturbed area. ESC permit condtions satisfied.
ESC16-00410 DOC - Permit Finaled9/29/20169/29/20169/29/2016 2:24:09 PMPPASS
ESC15-01287 General Inspection9/29/20169/29/20169/29/2016 2:01:31 PM CANC
rescheduled for site final on 10/3
ESC15-01343 General Inspection9/29/20169/29/20169/29/2016 2:00:29 PM CANC
ESC16-00397 Aging Inspection9/29/20169/29/20169/29/2016 1:50:11 PM PEND
No construction or demolition. Same findings as BLD inspector results. Foundation and driveways still onsite. No new BLD permit applications pending for parcel. No material leaving site, will continue to monitor. Vegetation and sidwalk surrounding foundation were undisturbed.
ESC16-00211 Aging Inspection9/29/20169/29/20169/29/2016 1:40:08 PM PASS
Home complete and landscaped. BLD finaled. ESC permit conditions satisified.
ESC16-00211 DOC - Permit Finaled9/29/20169/29/20169/29/2016 1:39:30 PMPPASS
MIS16-00269 ESC-Conference9/28/20169/29/20169/29/2016 12:24:49 PMPFAIL
Complaint of working w/out permits.

Posted Stop Work Order notice on recently installed fence. No ESC BMPs, no permits, no site identification, no applications with City pending.

No one on site. Left phone #. Will investigate who owner is or if related to property above site.
ESC16-00603 General Inspection9/29/20169/29/20169/29/2016 12:09:34 PMPPASS
Sediment basin construction/grading is complete. Fanned entrance to basin is lined with rip-rap. Slopes of basin have been horizontally tracked and pressurized low impact sprinkler irrigation has been installed. Veasy Seeding Inc. onsite apply dry seed mix of 8 native species intermixed with GrowGanics soil ammendment to provide nutrients to improve growth & soil biology. Today tacifier glue will dry and sprinkling will start tomorrow. No wattles need to be installed unless erosion issues, do not want to disturb the seed mix application.

No trackout, SWPPP posted. Appproved.
ESC15-00729 General Inspection9/29/20169/29/20169/29/2016 11:45:56 AM PEND
Work has occurred on the Council Springs access road. Subgrade of road mix is compacted, to be finish in asphalt. No corrections at this time. Consulting with Hunter and Syman on control measure for runoff along road..

Examine hillside areas for seed growth after rains.
ESC15-01256 General Inspection9/29/20169/29/20169/29/2016 11:03:02 AM CANC
ESC16-00958 General Inspection9/29/20169/29/20169/29/2016 11:02:51 AMAPASS
WIP on frame. Permit posted. Sidewalk and gutter free of loose dirt. Trash contained. No corrections needed.
ESC16-00841 General Inspection9/29/20169/29/20169/29/2016 11:02:39 AMAPASS
WIP on foundation and utility work. Crew on site watering area of excavation to keep dust down. Perimeter wattles installed and undisturbed. Permit posted. Approved.
ESC16-00145 Aging Inspection9/29/20169/29/20169/29/2016 10:42:22 AM PASS
ESC16-00489 General Inspection9/29/20169/29/20169/29/2016 10:41:34 AMPPASS
Subdivision work is near complete. Currently preparing to install water line to Barber Drive. SWPPP info posted at Barnside and Timbersaw and inspections binder onsite with proper inspection reports. No issues noted by Syman Inspector.

All DIs have been fitted with filter bags. No SFH construction yet. Landscaping of sidewalk medians is complete. No fugitive dust issues observed at time of inspection. Approved.
ESC16-01147 Site Preparation9/28/20169/29/20169/29/2016 10:34:47 AMAPASS
Clint Phone #: ###-####

BMPs installed. Approved for construction
ESC15-01439 DOC - Permit Finaled9/29/20169/29/20169/29/2016 10:30:13 AMPPASS
Home complete and landscaped/stabilized. Temp BMPs to remain during active construction in DHE
ESC15-01432 DOC - Permit Finaled9/29/20169/29/20169/29/2016 10:29:51 AMPPASS
Home complete and landscaped/stabilized. Temp BMPs to remain during active construction in DHE
ESC15-01434 DOC - Permit Finaled9/29/20169/29/20169/29/2016 10:29:41 AMPPASS
Home complete and landscaped/stabilized. Temp BMPs to remain during active construction in DHE
ESC15-01430 DOC - Permit Finaled9/29/20169/29/20169/29/2016 10:29:27 AMPPASS
Home complete and landscaped/stabilized. Temp BMPs to remain during active construction in DHE
ESC16-01126 Site Preparation9/28/20169/29/20169/29/2016 10:28:09 AMAPASS
Clint Phone #: ###-####

Permit posted with contact details. Active homes in compliance. DI bags have plenty of capture capacity. No windblown trash or uncontained washouts observed. Designated lined washout provided. Approved.
ESC15-00862 General Inspection9/29/20169/29/20169/29/2016 10:14:59 AM CANC
ESC13-00193 General Inspection9/29/20169/29/20169/29/2016 10:14:44 AM CANC
ESC15-01224 General Inspection9/29/20169/29/20169/29/2016 10:14:26 AM PASS
WIP on Library structure. Curbing, paving and parking areas are complete. Some landscaping is also in progress. No dirt stockpiles or trackout on permeable paver drainage areas. Permit sign posted on trailer. Clean site.
ESC16-01348 Site Preparation9/29/20169/29/20169/29/2016 9:00:52 AMACANC
spoke with homeowner RP Perry regarding ESC permit conditions. Contractor Saul will call for Site Prep early next week when ready to start project
ESC16-00419 Aging Inspection9/29/20169/29/20169/29/2016 8:37:25 AM PASS
Pool in backyard complete. No disturbed area or loose material on site. Culdesac is clean. All permits finaled.
ESC16-00419 DOC - Permit Finaled9/29/20169/29/20169/29/2016 8:35:22 AMPPASS
ESC16-00088 General Inspection9/26/20169/29/20169/28/2016 3:14:16 PMAPASS
WIP on interior finishes and exterior painting. No work occuring on large wall and below on the hillside. Driveway is not yet paved, no trackout at this time but will need construction entrance if it won't be paved/stabilized before November.
ESC15-00547 General Inspection9/23/20169/29/20169/28/2016 11:26:15 AMAPART
Further site corrections and clean up has occured. Excess dirt stockpile was removed. All DIs in sub and MS4 have sediment protection.

Corrections remaining:
- remove trash from bins on east side of site
- sweep entrance area, removed dirt from curb areas around crown.