Inspections for the day of: Friday, September 29, 2017.
Number of inspections: 21
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-00954 General Inspection9/28/20179/29/201710/2/2017 3:28:38 PMACANC
ESC16-01434 General Inspection9/29/20179/29/201710/2/2017 3:25:56 PM CANC
ESC15-01004 General Inspection9/29/20179/29/201710/2/2017 3:25:11 PM CANC
ESC17-00040 General Inspection9/29/20179/29/201710/2/2017 10:45:55 AM CANC
ESC16-01568 Aging Inspection9/29/20179/29/201710/2/2017 10:45:32 AM CANC
ESC17-00027 Site Preparation9/29/20179/29/20179/29/2017 3:13:27 PMPCANC
Roger Phone #: ###-####

rescheduled for monday
ESC17-00190 Conference9/26/20179/29/20179/29/2017 2:35:51 PMAPEND
10 AM

RP/developer reviewed slope stabilization. Next week will set schedule for installation of slope erosion and sediment controls. Currently the plan is to do wattles installed along contours and hydroseeding with a fiber matrix. I notified he should consider erosion control blankets as well.

Plan is to have erosion controls and seeding completed by the end of October or early November.
ESC16-01457 General Inspection9/29/20179/29/20179/29/2017 2:31:44 PM PEND
ESC16-01716 Aging Inspection9/29/20179/29/20179/29/2017 2:31:32 PM DONE
sign installed, no issues
ESC16-01716 DOC - Permit Finaled9/29/20179/29/20179/29/2017 2:31:19 PMPPASS
ESC16-01550 Aging Inspection9/29/20179/29/20179/29/2017 2:31:01 PM CANC
ESC16-01699 Aging Inspection9/29/20179/29/20179/29/2017 2:30:55 PM CANC
ESC16-00945 General Inspection9/29/20179/29/20179/29/2017 2:30:48 PM PASS
ESC16-01600 General Inspection9/29/20179/29/20179/29/2017 2:30:02 PM CANC
ESC16-01056 General Inspection9/29/20179/29/20179/29/2017 2:29:25 PM CANC
ESC16-01481 Aging Inspection9/29/20179/29/20179/29/2017 2:29:17 PM CANC
ESC17-01178 Site Preparation9/29/20179/29/20179/29/2017 2:28:32 PMPPASS
Flat site. Reviewed ESC conditions and expectations with GC-RP. Subdivision BMPs installed. Approved
ESC17-00654 General Inspection9/22/20179/29/20179/29/2017 2:26:36 PMAPART
Need construction entrance/trackout prevention.

Re-assess perimeter controls.
ESC12-00403 General Inspection9/29/20179/29/20179/29/2017 2:24:47 PM PASS
ESC16-00489 General Inspection9/29/20179/29/20179/29/2017 2:24:31 PM CANC
ESC13-00524 General Inspection9/26/20179/29/20179/29/2017 2:24:04 PMAPASS