ESC18-00020
| General Inspection | 8/31/2018 | 9/4/2018 | 9/10/2018 4:51:16 PM | A | PASS |
|
|
Subdivision BMPs installed. SFHs have individual ESC permits with BMPs implemented. Concrete washout bins with construction entrance are located on Hootowl. No work on next phase yet.
Note: - need to install additional controls around stockpile and disturbed area at top of subdivsion. Will follow up on this on next inspection.
|
ESC17-01453
| Site Final | 8/31/2018 | 9/4/2018 | 9/10/2018 4:15:40 PM | A | PASS |
|
|
Home complete and landscaped. ESC permit conditions for home are satisfied, see ESC18-00020 for all remaining ESC BMP removal. This permit finaled.
|
MIS18-00310
| ESC-Conference | 8/31/2018 | 9/4/2018 | 9/5/2018 2:56:53 PM | P | PASS |
|
|
Street and sidewalk were cleaned up Eagleson and Spaulding. No further corrections at this time.
|
ESC17-00018
| General Inspection | 8/31/2018 | 9/4/2018 | 9/5/2018 12:11:19 PM | A | PASS |
|
|
Subdivision BMPs installed. Need to improve secondary containment and maintenance around the roll off concrete washouts. Will work with HH and TVCW to get a better solution.
|
ESC18-00492
| General Inspection | 8/29/2018 | 9/4/2018 | 9/4/2018 4:41:41 PM | A | PASS |
|
|
Follow up on corrections to RP Chuck. He will have site swept and add additional BMPs as needed.
Sidewalk was swept as requested. No activity at time of inspection. No new violations observed.
Re-inspection fee removed due to RP requesting an inspection under the Public Works permit.
|
ESC17-01340
| General Inspection | 8/7/2018 | 9/4/2018 | 9/4/2018 3:58:21 PM | A | CANC |
|
|
|
ESC17-01408
| General Inspection | 9/4/2018 | 9/4/2018 | 9/4/2018 3:57:53 PM | | CANC |
|
|
|
ESC17-01370
| Site Final | 9/4/2018 | 9/4/2018 | 9/4/2018 3:29:19 PM | P | PASS |
|
|
Project complete. Area stabilized and temp BMPs removed. ESC permit finaled.
|
ESC18-00069
| General Inspection | 9/4/2018 | 9/4/2018 | 9/4/2018 2:41:42 PM | P | PART |
|
|
Correction request:
Sweep up loose gravel and dirt on Idaho and Capitol Street. DI's have sediment protection the but the bike lane entrance and sidwalk /crosswalk areas need some maintenance/clean up.
Verbal correction request to RP Anthony.
|
ESC18-00946
| Conference | 8/31/2018 | 9/4/2018 | 9/4/2018 2:26:55 PM | A | PASS |
|
|
call before you come-Damion Phone #: ###-####
Very steep hill on infill lot in Highlands. Initial excavation of driveway approach has began. Once driveway is cleared and excess dirt is hauled off, RP will install hillside and perimeter wattles. Rock retainiing wall will be placed prior to foundation work. RP-GC will be onsite to supervise and control traffic / spot for the excavator and dump trucks. Request to have ESC permit sign posted today.
Follow up inspection scheduled for Friday to check on wattle placement.
|
ESC17-01370
| General Inspection | 9/4/2018 | 9/4/2018 | 9/4/2018 12:53:58 PM | | CANC |
|
|
rescheduled for site final
|
ESC12-00403
| General Inspection | 9/4/2018 | 9/4/2018 | 9/4/2018 12:51:04 PM | | PASS |
|
|
Still monitoring former staging and laydown areas. No new construction occuring.
|
ESC17-00928
| DOC - Permit Finaled | 9/4/2018 | 9/4/2018 | 9/4/2018 8:18:05 AM | P | PASS |
|
|
|