Inspections for the day of: Tuesday, September 4, 2018.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-00020 General Inspection8/31/20189/4/20189/10/2018 4:51:16 PMAPASS
Subdivision BMPs installed. SFHs have individual ESC permits with BMPs implemented. Concrete washout bins with construction entrance are located on Hootowl. No work on next phase yet.

Note:
- need to install additional controls around stockpile and disturbed area at top of subdivsion. Will follow up on this on next inspection.
ESC17-01453 Site Final8/31/20189/4/20189/10/2018 4:15:40 PMAPASS
Home complete and landscaped. ESC permit conditions for home are satisfied, see ESC18-00020 for all remaining ESC BMP removal. This permit finaled.
MIS18-00310 ESC-Conference8/31/20189/4/20189/5/2018 2:56:53 PMPPASS
Street and sidewalk were cleaned up Eagleson and Spaulding. No further corrections at this time.
ESC17-00018 General Inspection8/31/20189/4/20189/5/2018 12:11:19 PMAPASS
Subdivision BMPs installed. Need to improve secondary containment and maintenance around the roll off concrete washouts. Will work with HH and TVCW to get a better solution.
ESC18-00492 General Inspection8/29/20189/4/20189/4/2018 4:41:41 PMAPASS
Follow up on corrections to RP Chuck. He will have site swept and add additional BMPs as needed.

Sidewalk was swept as requested. No activity at time of inspection. No new violations observed.

Re-inspection fee removed due to RP requesting an inspection under the Public Works permit.
ESC17-01340 General Inspection8/7/20189/4/20189/4/2018 3:58:21 PMACANC
ESC17-01408 General Inspection9/4/20189/4/20189/4/2018 3:57:53 PM CANC
ESC17-01370 Site Final9/4/20189/4/20189/4/2018 3:29:19 PMPPASS
Project complete. Area stabilized and temp BMPs removed. ESC permit finaled.
ESC18-00069 General Inspection9/4/20189/4/20189/4/2018 2:41:42 PMPPART
Correction request:

Sweep up loose gravel and dirt on Idaho and Capitol Street. DI's have sediment protection the but the bike lane entrance and sidwalk /crosswalk areas need some maintenance/clean up.

Verbal correction request to RP Anthony.
ESC18-00946 Conference8/31/20189/4/20189/4/2018 2:26:55 PMAPASS
call before you come-Damion Phone #: ###-####

Very steep hill on infill lot in Highlands. Initial excavation of driveway approach has began. Once driveway is cleared and excess dirt is hauled off, RP will install hillside and perimeter wattles. Rock retainiing wall will be placed prior to foundation work. RP-GC will be onsite to supervise and control traffic / spot for the excavator and dump trucks. Request to have ESC permit sign posted today.

Follow up inspection scheduled for Friday to check on wattle placement.
ESC17-01370 General Inspection9/4/20189/4/20189/4/2018 12:53:58 PM CANC
rescheduled for site final
ESC12-00403 General Inspection9/4/20189/4/20189/4/2018 12:51:04 PM PASS
Still monitoring former staging and laydown areas. No new construction occuring.
ESC17-00928 DOC - Permit Finaled9/4/20189/4/20189/4/2018 8:18:05 AMPPASS