PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Wednesday, September 4, 2019
.
Number of inspections:
9
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC18-01017
Aging Inspection
9/4/2019
9/4/2019
9/4/2019 12:28:53 PM
PASS
ESC18-00803
General Inspection
9/4/2019
9/4/2019
9/4/2019 12:26:20 PM
PASS
ESC18-00845
General Inspection
9/4/2019
9/4/2019
9/4/2019 12:26:19 PM
CANC
ESC19-00106
Site Preparation
9/4/2019
9/4/2019
9/4/2019 9:58:58 AM
P
PASS
Project walk through and BMP overview.
Project inlcudes renovating grassy areas into pollinator/native plant gardens, building new elevated boardwalk in the SE corner of park, new pond overlook features, railing installation and painting. Ponds are in process of draining so work around banks, bridges and overlooks will be dry.
Grassy areas will be tilled and then re-planted, no removal of topsoil. Most areas area surrounded by 50' buffers to any surface waters.
BMPs installed:
- SWPPP binder and permit billboard sign on site.
- Parking lot storm drainage curb cuts have sediment protection installed.
- Above ground concrete washout to be staged prior to any concrete placement
- Requested that drip pans and/or spill kits be used and available in equipment parking areas
- Additional sediment controls will be installed after earth disturbance as needed.
- Site will conduct SWPPP inspections at a 2 week frequency and post significant rainfall events.
Approved for construction.
ESC19-00106
General Inspection
9/4/2019
9/4/2019
9/4/2019 9:58:32 AM
P
CANC
ESC18-01243
General Inspection
9/4/2019
9/4/2019
9/4/2019 8:30:20 AM
CANC
ESC18-00264
General Inspection
9/4/2019
9/4/2019
9/4/2019 8:29:07 AM
CANC
ESC18-00497
General Inspection
9/4/2019
9/4/2019
9/4/2019 8:28:54 AM
CANC
ESC18-01552
General Inspection
9/4/2019
9/4/2019
9/4/2019 8:28:40 AM
CANC