PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Thursday, September 6, 2018
.
Number of inspections:
11
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC17-01662
General Inspection
9/6/2018
9/6/2018
9/10/2018 4:45:55 PM
PASS
Near completion. Need to stabilized hillside below pool house sod area and Barber Driver.
ESC18-00892
General Inspection
8/17/2018
9/6/2018
9/10/2018 3:39:43 PM
A
CANC
ESC17-00774
General Inspection
9/5/2018
9/6/2018
9/10/2018 3:34:14 PM
A
PASS
NO new activity or recent construction. No water in Warm Springs creek except close to the River. Willows on lower section are growing well, upper section was too dry so many of the cuttings have dried out and died. No erosion, loose netting or other issues observed.
ESC17-01437
Site Final
9/6/2018
9/6/2018
9/10/2018 3:08:03 PM
P
PASS
Work complete. Home is landscaped, stabilized, and cleaned. Temp BMPs (DI bag downhill on HV Road) will be removed under main site ESC permit.
ESC18-00069
General Inspection
9/4/2018
9/6/2018
9/6/2018 1:44:11 PM
A
PASS
Area in front of bikelane and in crosswalks was swept up. New work occuring the west lane now. No new corrections.
ESC17-01437
General Inspection
9/6/2018
9/6/2018
9/6/2018 10:23:14 AM
PASS
ESC16-01650
General Inspection
9/6/2018
9/6/2018
9/6/2018 9:46:21 AM
A
PART
WIP on SFHs. Foundations for the west section have been poured and will be ready for framing this fall & winter. Concrete washout pit located at west end of street. Bottom is lined
Slope between subdivision and greenbelt has been vegetated. Supplemental irrigation has been installed to help get grasses established.
Silt fence was removed. Bark wattles are properly installed.
Correction requests for next inspection issued to Steve with CMG:
-A final row should be installed at the toe of the slope.
- sweep up concrete slurry dribbled on path from the new subdivision access path.
- fix lining on washout (request to Blackrock Homes)
ESC18-00313
Tracking Control
9/5/2018
9/6/2018
9/6/2018 9:25:37 AM
A
PEND
RP stated clean up has begun, construciton entrances and storm drain protection will be installed by Friday. Rescheduled.
ESC17-01200
General Inspection
9/6/2018
9/6/2018
9/6/2018 8:07:54 AM
CANC
ESC17-01652
General Inspection
9/6/2018
9/6/2018
9/6/2018 8:07:04 AM
CANC
ESC17-00078
General Inspection
9/4/2018
9/6/2018
9/5/2018 12:52:46 PM
P
PASS
No activity. SFHs are now in planning and permitting phase. No violations observed, no requests at this time