Inspections for the day of: Wednesday, September 7, 2016.
Number of inspections: 28
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC14-01063 General Inspection9/7/20169/7/20169/9/2016 7:52:36 AM CANC
ESC15-00857 General Inspection9/7/20169/7/20169/9/2016 7:52:27 AM CANC
ESC16-01087 General Inspection9/2/20169/7/20169/8/2016 11:09:52 AMPPASS
Foundation work in progress. No sediment or stockpiling on sidewalk. Back alley perimeter has Gator Guard wattle installed and inlet protection on the nearby storm drain.
ESC15-00794 General Inspection9/6/20169/7/20169/8/2016 10:39:26 AMPPASS
ESC16-00094 General Inspection9/7/20169/7/20169/7/2016 4:56:58 PM PASS
ESC16-00088 General Inspection9/7/20169/7/20169/7/2016 4:35:03 PM CANC
ESC15-01537 Aging Inspection9/7/20169/7/20169/7/2016 4:34:56 PM CANC
rescheduled for site final
ESC15-01004 General Inspection9/7/20169/7/20169/7/2016 4:34:10 PM PASS
Vertical work in progress. No trackout or discharges. Concrete washout containers utilitized and MS4 inlets have sediment filter bags installed.
ESC14-00296 General Inspection9/7/20169/7/20169/7/2016 4:33:12 PM CANC
rescheduled
ESC15-00306 General Inspection9/7/20169/7/20169/7/2016 4:32:32 PM CANC
No inspeciton, site is in revegetation phase. No new associated projects or earth disturbances.
ESC16-00325 Aging Inspection9/7/20169/7/20169/7/2016 12:18:24 PM CANC
ESC16-00202 Aging Inspection9/7/20169/7/20169/7/2016 12:17:23 PM PASS
Home near completion. Yard not yet landscaped/stabilized. Painting crew working on exterior. No sediment trackout, discharges, or uncontained washout observed.
ESC14-00206 General Inspection9/6/20169/7/20169/7/2016 11:54:02 AMPPASS
Permit open to monitor temp BMP removal. SFHs in Sunnyridge in progress by Hayden Homes. No subdivsion work. No correction requests at this time.
ESC16-00816 General Inspection9/7/20169/7/20169/7/2016 11:47:28 AMAPASS
WIP, near completion. Not yet stabilized.

Verbal Reminder to RP with Hayden to clean around inlets on Bend Ridge and Deer Ridge and temporary BMP sediment filter bags upon completion of this project.
ESC16-00746 General Inspection9/7/20169/7/20169/7/2016 11:47:13 AMAPASS
WIP, near completion. Not yet stabilized.

Verbal Reminder to RP with Hayden to clean around inlets on Bend Ridge and Deer Ridge and temporary BMP sediment filter bags upon completion of this project.
ESC16-00123 Site Final9/7/20169/7/20169/7/2016 11:38:20 AMAPASS
SFH complete, landscaped and occupied. No temp BMP removal required due to ongoing active construction. Reminder issued to Hayden Homes RP to clean gutter around inlets and remove temp. BMP sediment filter bag out of storm drains with no more active homes within drainage area.
ESC16-00376 Site Final9/7/20169/7/20169/7/2016 11:38:06 AMAPASS
SFH complete, landscaped and occupied. No temp BMP removal required due to ongoing active construction. Reminder issued to Hayden Homes RP to clean gutter around inlets and remove temp. BMP sediment filter bag out of storm drains with no more active homes within drainage area.
ESC16-00382 Site Final9/7/20169/7/20169/7/2016 11:32:02 AMAPASS
SFH complete, landscaped and occupied. No temp BMP removal required due to ongoing active construction. Reminder issued to Hayden Homes RP to clean gutter around inlets and remove temp. BMP sediment filter bag out of storm drains with no more active homes within drainage area.
ESC16-00596 Site Final9/7/20169/7/20169/7/2016 11:31:43 AMAPASS
SFH complete, landscaped and occupied. No temp BMP removal required due to ongoing active construction. Reminder issued to Hayden Homes RP to clean gutter around inlets and remove temp. BMP sediment filter bag out of storm drains with no more active homes within drainage area.
ESC16-00594 Site Final9/7/20169/7/20169/7/2016 11:31:30 AMAPASS
SFH complete, landscaped and occupied. No temp BMP removal required due to ongoing active construction. Reminder issued to Hayden Homes RP to clean gutter around inlets and remove temp. BMP sediment filter bag out of storm drains with no more active homes within drainage area.
ESC16-00521 Site Final9/7/20169/7/20169/7/2016 11:06:18 AMAPASS
SFH complete, landscaped and occupied. No temp BMP removal required due to ongoing active construction. Reminder issued to Hayden Homes RP to clean gutter around inlets and remove temp. BMP sediment filter bag out of storm drains with no more active homes within drainage area.
ESC16-00489 Random Inspection9/7/20169/7/20169/7/2016 10:35:14 AMPPASS
Subdivsion development work is now complete and parcels are ready for SFH builders to begin.

All new DI's have been installed with sediment filter bags and the road shoulders between sidewalks have been landscaped, forming vegetated buffer. No corrections requested.
ESC16-00159 Random Inspection9/7/20169/7/20169/7/2016 10:09:39 AMPPEND
Need to remove temporary BMPs in creek...

Discussed with RP and Syman Company
ESC16-00489 General Inspection9/7/20169/7/20169/7/2016 10:08:31 AMPCANC
data entry error
ESC15-00667 General Inspection9/7/20169/7/20169/7/2016 9:58:42 AM PART
Sections of silt fence have been removed since last request. One larger section of drainage ditch still has silt fence installed.

Agreed with RP to extend Site Final to 9/21 due to progress and cooperation. Gary stated it will be done. Silt fence is a temporary linear BMP.
ESC15-01532 Random Inspection9/7/20169/7/20169/7/2016 9:45:09 AMAPEND
Observed temporary BMP sediment filter bags still installed in MS4 inlets. Construction within the drainages of these inlets is complete and stabilized.

VM left to RP Brent with CPC to remove all inlet bags installed (Garden, Fairview, Main). Boise Parks will assume control of the pathway revegetation and BMP removal.
ESC15-01627 Aging Inspection9/7/20169/7/20169/7/2016 8:24:22 AM DEFR
To be finaled with BLD permit by BLD inspector. No issues reported; low risk project
ESC15-01538 DOC - Permit Finaled9/7/20169/7/20169/7/2016 8:22:00 AMPPASS