ESC14-01063
| General Inspection | 9/7/2016 | 9/7/2016 | 9/9/2016 7:52:36 AM | | CANC |
|
|
|
ESC15-00857
| General Inspection | 9/7/2016 | 9/7/2016 | 9/9/2016 7:52:27 AM | | CANC |
|
|
|
ESC16-01087
| General Inspection | 9/2/2016 | 9/7/2016 | 9/8/2016 11:09:52 AM | P | PASS |
|
|
Foundation work in progress. No sediment or stockpiling on sidewalk. Back alley perimeter has Gator Guard wattle installed and inlet protection on the nearby storm drain.
|
ESC15-00794
| General Inspection | 9/6/2016 | 9/7/2016 | 9/8/2016 10:39:26 AM | P | PASS |
|
|
|
ESC16-00094
| General Inspection | 9/7/2016 | 9/7/2016 | 9/7/2016 4:56:58 PM | | PASS |
|
|
|
ESC16-00088
| General Inspection | 9/7/2016 | 9/7/2016 | 9/7/2016 4:35:03 PM | | CANC |
|
|
|
ESC15-01537
| Aging Inspection | 9/7/2016 | 9/7/2016 | 9/7/2016 4:34:56 PM | | CANC |
|
|
rescheduled for site final
|
ESC15-01004
| General Inspection | 9/7/2016 | 9/7/2016 | 9/7/2016 4:34:10 PM | | PASS |
|
|
Vertical work in progress. No trackout or discharges. Concrete washout containers utilitized and MS4 inlets have sediment filter bags installed.
|
ESC14-00296
| General Inspection | 9/7/2016 | 9/7/2016 | 9/7/2016 4:33:12 PM | | CANC |
|
|
rescheduled
|
ESC15-00306
| General Inspection | 9/7/2016 | 9/7/2016 | 9/7/2016 4:32:32 PM | | CANC |
|
|
No inspeciton, site is in revegetation phase. No new associated projects or earth disturbances.
|
ESC16-00325
| Aging Inspection | 9/7/2016 | 9/7/2016 | 9/7/2016 12:18:24 PM | | CANC |
|
|
|
ESC16-00202
| Aging Inspection | 9/7/2016 | 9/7/2016 | 9/7/2016 12:17:23 PM | | PASS |
|
|
Home near completion. Yard not yet landscaped/stabilized. Painting crew working on exterior. No sediment trackout, discharges, or uncontained washout observed.
|
ESC14-00206
| General Inspection | 9/6/2016 | 9/7/2016 | 9/7/2016 11:54:02 AM | P | PASS |
|
|
Permit open to monitor temp BMP removal. SFHs in Sunnyridge in progress by Hayden Homes. No subdivsion work. No correction requests at this time.
|
ESC16-00816
| General Inspection | 9/7/2016 | 9/7/2016 | 9/7/2016 11:47:28 AM | A | PASS |
|
|
WIP, near completion. Not yet stabilized.
Verbal Reminder to RP with Hayden to clean around inlets on Bend Ridge and Deer Ridge and temporary BMP sediment filter bags upon completion of this project.
|
ESC16-00746
| General Inspection | 9/7/2016 | 9/7/2016 | 9/7/2016 11:47:13 AM | A | PASS |
|
|
WIP, near completion. Not yet stabilized.
Verbal Reminder to RP with Hayden to clean around inlets on Bend Ridge and Deer Ridge and temporary BMP sediment filter bags upon completion of this project.
|
ESC16-00123
| Site Final | 9/7/2016 | 9/7/2016 | 9/7/2016 11:38:20 AM | A | PASS |
|
|
SFH complete, landscaped and occupied. No temp BMP removal required due to ongoing active construction. Reminder issued to Hayden Homes RP to clean gutter around inlets and remove temp. BMP sediment filter bag out of storm drains with no more active homes within drainage area.
|
ESC16-00376
| Site Final | 9/7/2016 | 9/7/2016 | 9/7/2016 11:38:06 AM | A | PASS |
|
|
SFH complete, landscaped and occupied. No temp BMP removal required due to ongoing active construction. Reminder issued to Hayden Homes RP to clean gutter around inlets and remove temp. BMP sediment filter bag out of storm drains with no more active homes within drainage area.
|
ESC16-00382
| Site Final | 9/7/2016 | 9/7/2016 | 9/7/2016 11:32:02 AM | A | PASS |
|
|
SFH complete, landscaped and occupied. No temp BMP removal required due to ongoing active construction. Reminder issued to Hayden Homes RP to clean gutter around inlets and remove temp. BMP sediment filter bag out of storm drains with no more active homes within drainage area.
|
ESC16-00596
| Site Final | 9/7/2016 | 9/7/2016 | 9/7/2016 11:31:43 AM | A | PASS |
|
|
SFH complete, landscaped and occupied. No temp BMP removal required due to ongoing active construction. Reminder issued to Hayden Homes RP to clean gutter around inlets and remove temp. BMP sediment filter bag out of storm drains with no more active homes within drainage area.
|
ESC16-00594
| Site Final | 9/7/2016 | 9/7/2016 | 9/7/2016 11:31:30 AM | A | PASS |
|
|
SFH complete, landscaped and occupied. No temp BMP removal required due to ongoing active construction. Reminder issued to Hayden Homes RP to clean gutter around inlets and remove temp. BMP sediment filter bag out of storm drains with no more active homes within drainage area.
|
ESC16-00521
| Site Final | 9/7/2016 | 9/7/2016 | 9/7/2016 11:06:18 AM | A | PASS |
|
|
SFH complete, landscaped and occupied. No temp BMP removal required due to ongoing active construction. Reminder issued to Hayden Homes RP to clean gutter around inlets and remove temp. BMP sediment filter bag out of storm drains with no more active homes within drainage area.
|
ESC16-00489
| Random Inspection | 9/7/2016 | 9/7/2016 | 9/7/2016 10:35:14 AM | P | PASS |
|
|
Subdivsion development work is now complete and parcels are ready for SFH builders to begin.
All new DI's have been installed with sediment filter bags and the road shoulders between sidewalks have been landscaped, forming vegetated buffer. No corrections requested.
|
ESC16-00159
| Random Inspection | 9/7/2016 | 9/7/2016 | 9/7/2016 10:09:39 AM | P | PEND |
|
|
Need to remove temporary BMPs in creek...
Discussed with RP and Syman Company
|
ESC16-00489
| General Inspection | 9/7/2016 | 9/7/2016 | 9/7/2016 10:08:31 AM | P | CANC |
|
|
data entry error
|
ESC15-00667
| General Inspection | 9/7/2016 | 9/7/2016 | 9/7/2016 9:58:42 AM | | PART |
|
|
Sections of silt fence have been removed since last request. One larger section of drainage ditch still has silt fence installed.
Agreed with RP to extend Site Final to 9/21 due to progress and cooperation. Gary stated it will be done. Silt fence is a temporary linear BMP.
|
ESC15-01532
| Random Inspection | 9/7/2016 | 9/7/2016 | 9/7/2016 9:45:09 AM | A | PEND |
|
|
Observed temporary BMP sediment filter bags still installed in MS4 inlets. Construction within the drainages of these inlets is complete and stabilized.
VM left to RP Brent with CPC to remove all inlet bags installed (Garden, Fairview, Main). Boise Parks will assume control of the pathway revegetation and BMP removal.
|
ESC15-01627
| Aging Inspection | 9/7/2016 | 9/7/2016 | 9/7/2016 8:24:22 AM | | DEFR |
|
|
To be finaled with BLD permit by BLD inspector. No issues reported; low risk project
|
ESC15-01538
| DOC - Permit Finaled | 9/7/2016 | 9/7/2016 | 9/7/2016 8:22:00 AM | P | PASS |
|
|
|