Inspections for the day of: Tuesday, September 8, 2015.
Number of inspections: 25
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC12-00130 General Inspection9/8/20159/8/20159/9/2015 4:57:01 PM PASS
ESC15-00138 General Inspection9/8/20159/8/20159/9/2015 3:02:52 PM PASS
Project complete. No disturbed area or loose sediment remaining at site. Permit closed.
ESC14-00911 DOC - Permit Finaled9/8/20159/8/20159/8/2015 4:39:06 PMPPASS
ESC15-00107 General Inspection9/8/20159/8/20159/8/2015 4:38:45 PM PASS
site demolition and staging for new construction in progress. No sediment or other materials leaving site. No corrections.
ESC14-01184 Aging Inspection9/8/20159/8/20159/8/2015 4:26:39 PM PASS
ESC14-00988 DOC - Permit Finaled9/8/20159/8/20159/8/2015 4:23:56 PMPPASS
ESC15-00142 General Inspection9/8/20159/8/20159/8/2015 4:23:12 PM PART
Trackout to Morningside needs to be swept up and construction entrance re-inspected and maintained as necessary.

Need to schedule conference regading preventive erosion control on slopes below the retaining wall built into the rock.
ESC15-00082 General Inspection9/8/20159/8/20159/8/2015 4:09:34 PM CANC
ESC14-00608 General Inspection9/8/20159/8/20159/8/2015 4:09:11 PM PASS
ESC15-00099 Aging Inspection9/8/20159/8/20159/8/2015 2:40:03 PM PASS
ESC permit conditions satisfied. Permit finaled.
ESC15-00099 DOC - Permit Finaled9/8/20159/8/20159/8/2015 2:38:46 PMPPASS
ESC15-00414 Site Preparation9/8/20159/8/20159/8/2015 2:30:19 PMPPASS
Clint Phone #: ###-####


Permit posted. Tahoe Homes' BMPs in East Valley installed. Permit sign posted, lot ready for excavation
ESC15-00719 Site Preparation9/8/20159/8/20159/8/2015 2:29:57 PMPPASS
Clint Phone #: ###-####

Permit posted. Tahoe Homes' BMPs in East Valley installed. Permit sign posted, lot ready for excavation.
ESC14-01128 DOC - Permit Finaled9/8/20159/8/20159/8/2015 1:43:26 PMPPASS
Work complete for this permit. Skywest Hangar site revegetation/stabilization being inspected under ESC14-0041
ESC13-00294 Site Final9/8/20159/8/20159/8/2015 1:23:21 PMPPASS
Corrections issued on previous inspection were complete. ESC permit conditions satisfied. Adjacent lots by same developer still open and under permit conditions.

Permit finaled.
ESC13-00294 Site Preparation9/8/20159/8/20159/8/2015 1:21:58 PMPCANC
data entry error, disregard
ESC14-00031 DOC - Permit Finaled9/8/20159/8/20159/8/2015 12:00:58 PMPPASS
ESC15-00187 Aging Inspection9/8/20159/8/20159/8/2015 11:40:56 AM PASS
WIP. Home construction complete, landscaping, final site cleanup, and temp BMP removal remain.

No trackout, discharges, or other issues observed; clean site.
ESC15-00185 Aging Inspection9/8/20159/8/20159/8/2015 11:40:38 AM PASS
WIP. Home construction complete, landscaping, final site cleanup, and temp BMP removal remain.

No trackout, discharges, or other issues observed; clean site.
ESC15-00186 Aging Inspection9/8/20159/8/20159/8/2015 11:40:20 AM PASS
WIP. Home construction complete, landscaping, final site cleanup, and temp BMP removal remain.

No trackout, discharges, or other issues observed; clean site.
ESC15-00126 General Inspection9/8/20159/8/20159/8/2015 10:51:53 AM PASS
WIP. No corrections necessary, clean site.
ESC14-00731 General Inspection9/8/20159/8/20159/8/2015 10:50:01 AM PASS
Construction complete and home is occupied. Street,sidewalk and gutter have been swept and cleaned. Yard landscaped/stabilized with temp BMPs removed.

Hillside revegetation /stabilization bond issued by Public Works hillside review in effect. No further ESC inspections.
ESC14-00731 DOC - Permit Finaled9/8/20159/8/20159/8/2015 10:48:16 AMPPASS
ESC14-00299 General Inspection9/8/20159/8/20159/8/2015 9:54:31 AM FAIL
Site observations:

1. Illicit washout of stucco waste, uncontained and spilled hardened onto adjacent property.

2. Home below house on Curling reports that sediment and sand from site has killed flowers and plants in yard. Fence posts and planks have started to bow, possibly indicating the entire site is moving down hill.

3. Potential retaining wall failure observed. Measures between 43-45 "

Working with hillside engineer to consult with geotech.

Case pending.
ESC15-00976 Site Preparation9/3/20159/8/20159/8/2015 9:15:49 AMAPASS
Idaho Street Townhomes @ 8:30 AM

Steve: ###-####

ESC permit sign posted with site details, BMPs installed including drop inlet bags on all potential receiving stormdrains. No infill or offhauling, allowed to install construction entrance after site grubbing and sewer taps installation on alley to the south. Perimter straw wattles properly staked and below grade of sidewalk pavement.

Approved for excavation. RP Steve on-site, will post EPA eNOI tracking number on ESC sign.