Inspections for the day of: Thursday, September 8, 2016.
Number of inspections: 27
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-01188 General Inspection9/8/20169/8/20169/9/2016 2:39:29 PM PART
No trackout or discharges.

Correction:

need to repair DI sediment filter mat next week. Request already issued under ESC15-00094
ESC16-00339 Aging Inspection9/8/20169/8/20169/9/2016 1:43:19 PM CANC
ESC16-00350 Aging Inspection9/8/20169/8/20169/9/2016 1:43:07 PM CANC
ESC16-00178 General Inspection9/8/20169/8/20169/9/2016 7:54:13 AM CANC
ESC16-00098 General Inspection9/8/20169/8/20169/9/2016 7:54:02 AM CANC
ESC16-00208 General Inspection9/8/20169/8/20169/8/2016 4:54:50 PM CANC
rescheduled
ESC16-00175 General Inspection9/8/20169/8/20169/8/2016 4:54:09 PM CANC
ESC14-00296 General Inspection9/7/20169/8/20169/8/2016 4:53:13 PMPPASS
ESC16-01010 Site Preparation9/8/20169/8/20169/8/2016 1:41:08 PMPPASS
Brett Phone #: ###-####

Final lot in Southern Landing, was thought to remain inactive and all temp BMPs were removed per request. Permit sign posted and an inlet bag will be installed in stormdrain on Trutina. Approved for construction.
ESC15-01537 Site Final9/7/20169/8/20169/8/2016 12:06:14 PMPNR
WIP. Driveway not yet stabilized. Street & gutter are clean. No violations. Will continue to monitor.
ESC16-01127 Site Preparation9/8/20169/8/20169/8/2016 11:48:11 AMPPASS
Clint Phone #: ###-####


Tahoe Homes RP on site. Lined concrete washout located at south end of alley between Milbrook and Shadywood. Permit sign posted with contact details. Approved for construction. First new homes of DHE #14.
ESC16-01125 Site Preparation9/8/20169/8/20169/8/2016 11:47:54 AMPPASS
Clint Phone #: ###-####


Tahoe Homes RP on site. Lined concrete washout located at south end of alley between Milbrook and Shadywood. Permit sign posted with contact details. Approved for construction. First new homes of DHE #14.
ESC16-01121 Site Preparation9/8/20169/8/20169/8/2016 11:47:40 AMPPASS
Clint Phone #: ###-####

Tahoe Homes RP on site. Lined concrete washout located at south end of alley between Milbrook and Shadywood. Permit sign posted with contact details. Approved for construction. First new homes of DHE #14.

ESC16-00602 Site Preparation9/7/20169/8/20169/8/2016 11:40:07 AMAPASS
This home had a general inspect in late June and I was out of office when should have been called in"structure is framed now. Inspection requested via web by Erby Gonzales

WIP, as mentioned by RP. No violations. Subdivision has been in good compliance with BMPs installed and regular housekeeping, street sweeping , and pick up of wind blown litter on south side of Warm Springs. Approved.
ESC15-01579 General Inspection9/8/20169/8/20169/8/2016 11:33:45 AM PASS
Silt fence perimeter is in good condition and surrounds entire site. No trackout or discharges to Parkcenter, MS4 inlets have sediment control. Onsite permanent storm water facilities have been installed and site retains own storm water now. Workers are parking across street, no issues. Property owner is co-developer of project.
ESC15-01437 Site Final9/6/20169/8/20169/8/2016 10:40:16 AMPCANC
rescheduled
ESC15-00794 DOC - Permit Finaled9/8/20169/8/20169/8/2016 10:39:16 AMPPASS
No construction observed, no activity on BLD since Oct 2015. Rock stockpile onsite for landscaping parking lot median. No trackout or temp BMPs in MS4 or ROW. No further ESC inspections.
ESC16-00304 General Inspection9/8/20169/8/20169/8/2016 10:31:24 AM PASS
Interior work in recently completed commercial complex is in progress. No loose materials or storm water pollutant sources observed. Parking lot, landscaping are complete.
ESC15-01055 Site Final8/15/20169/8/20169/8/2016 10:22:20 AMANR
Interior work still in progress. Parking lot has been swept. Trash container on site.
ESC16-00578 General Inspection9/8/20169/8/20169/8/2016 10:16:28 AMAPASS
Foundation installed, crew working on frame. Project surrounded by large paving lot. No trackout and no stockpiles/loose dirt on asphalt. No violations occuring.
ESC16-00277 DOC - Permit Finaled9/8/20169/8/20169/8/2016 10:04:39 AMPPASS
Demo complete. New structure in progress and covered under ESC16-00578.
ESC16-00345 Aging Inspection9/8/20169/8/20169/8/2016 9:57:09 AM PASS
ESC16-00310 General Inspection9/8/20169/8/20169/8/2016 9:53:11 AM CANC
rescheduled for 9/9
ESC15-01519 General Inspection9/8/20169/8/20169/8/2016 9:14:43 AM PASS
Vertical construction in progress. Construction entrance preventing trackout. No spills or discharges observed. MS4 inlets have sediment protection. Approved.
ESC16-00038 Aging Inspection9/8/20169/8/20169/8/2016 8:40:55 AM PASS
ESC15-01625 Aging Inspection9/8/20169/8/20169/8/2016 8:40:45 AM PASS
ESC16-00941 General Inspection8/30/20169/8/20169/7/2016 10:49:46 AMAPASS
check for remaining BMP installations and dust control

Permit sign posted. Dust suppression water being used during active grading. No plumes visible. Construction entrance rock is onsite for installation. No trackout. Silt fence perimeter and chain link fence are in excellent condition.