Inspections for the day of: Thursday, November 12, 2015.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorEvan Jenkins
TitleEROSION CONTROL MANAGER
Phone #794-3958
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-00569 Aging Inspection11/12/201511/12/201511/12/2015 2:56:21 PM DONE
ESC15-00569 DOC - Permit Finaled11/12/201511/12/201511/12/2015 2:56:13 PMPPASS
SFH complete
ESC Conditions Satisfied
ESC15-00391 General Inspection11/12/201511/12/201511/12/2015 2:25:11 PM PEND
near completion
ESC15-00857 BMP Violation11/12/201511/12/201511/12/2015 1:14:18 PMPPASS
Ensure Connell Development gets back into compliance from NOV issued on 11-10-12 (2 day allowence)

Contractor installed 650' LF or straw and compost waddles per their site plan. Construction beggining on water main break today with the use of grading, rip rap and the damaged trail will be graveled once the ground freezes to get equiptment in their. They are beggining to place straw over disturbed area for damaged areas.
ESC12-01066 General Inspection11/12/201511/12/201511/12/2015 12:05:34 PM PEND
ESC15-00378 General Inspection11/12/201511/12/201511/12/2015 11:22:31 AM PASS
No Activity at time of inspection. BMP's still installed. no discharges leaving the site.
ESC15-00383 Aging Inspection11/12/201511/12/201511/12/2015 10:56:19 AM DONE
ESC15-00383 DOC - Permit Finaled11/12/201511/12/201511/12/2015 10:55:47 AMPPASS
ESC15-01294 Site Preparation11/10/201511/12/201511/12/2015 10:49:35 AMAPASS
Bob Phone #: ###-####

Approved for construction