Inspections for the day of: Monday, December 21, 2015.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorEvan Jenkins
TitleEROSION CONTROL MANAGER
Phone #794-3958
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-01171 Stop Work Order12/21/201512/21/201512/29/2015 9:16:06 AMAPASS
Reinspection to see if project is back in compliance

Corrections have been addressed
ESC15-01480 Stop Work Order12/18/201512/21/201512/21/2015 4:45:40 PMPFAIL
Today's 12-18-15 SWO inspection was meant for today. Follow up on the 12-21-15 to ensure compliance or SWO will continue to be issued

No Corrections have been made at this time
ESC15-00857 Stop Work Order12/21/201512/21/201512/21/2015 4:45:04 PMAFAIL
Multiple BMP violations, issues continue

Direct Illicit Discharge currently taking place into Crane Creek. Took Photos and a video for proof. All 3 ponds are connected via MS4 Piping from top pond located on Phase 8 to bottom pond.
ESC14-01063 Stop Work Order12/21/201512/21/201512/21/2015 4:44:43 PMAFAIL
Multiple BMP violations, issues continue

Direct Illicit Discharge currently taking place into Crane Creek. Took Photos and a video for proof. All 3 ponds are connected via MS4 Piping from top pond located on Phase 8 to bottom pond.
ESC15-01389 Site Preparation12/21/201512/21/201512/21/2015 1:24:05 PMPPASS
would like call ahead; Rick Phone #: ###-####

Permit Posted
Approved for construction once weather and site dries up from significant rainfall events
ESC12-00403 General Inspection12/21/201512/21/201512/21/2015 1:04:12 PM PASS
ESC15-01075 Stop Work Order12/21/201512/21/201512/21/2015 10:48:12 AMAPASS
Sediment discharged offsite onto lower neighbors property.
Address BMP corrections

Corrections have been made. SWO lifted
ESC13-00524 General Inspection12/21/201512/21/201512/21/2015 9:57:26 AM PASS
ESC15-01283 Site Preparation12/18/201512/21/201512/21/2015 9:38:01 AMAFAIL
Stop Work Order was issued on the 12-18-15 for work being performed prior to Required Site Prep Inspection. Also, significant track out needs swept up and effective perimeter BMP's needs to be installed with construction entrance.
ESC14-01132 General Inspection12/21/201512/21/201512/21/2015 8:32:36 AM CANC
Fee's due; no inspection
ESC15-01480 Stop Work Order12/18/201512/21/201512/18/2015 6:15:36 PMADONE
Stop Work Order Issued onsite. WIll follow up Monday on the 12-21-15