ESC14-01060
| General Inspection | 5/6/2015 | 5/6/2015 | 5/6/2015 4:09:09 PM | | PASS |
|
|
|
ESC13-00806
| General Inspection | 5/6/2015 | 5/6/2015 | 5/6/2015 2:34:14 PM | | PASS |
|
|
no changes since last inspection
|
ESC13-00918
| General Inspection | 5/6/2015 | 5/6/2015 | 5/6/2015 2:29:39 PM | | PASS |
|
|
New Stockpiles on this lot. No discharges offisite at this time
|
ESC11-00879
| General Inspection | 5/6/2015 | 5/6/2015 | 5/6/2015 2:23:17 PM | | PASS |
|
|
Illegal concrete washout has been recently removed. No other esc issues at this time
|
ESC14-00692
| Aging Inspection | 5/6/2015 | 5/6/2015 | 5/6/2015 2:18:43 PM | | PASS |
|
|
|
ESC14-00878
| Aging Inspection | 5/6/2015 | 5/6/2015 | 5/6/2015 1:46:40 PM | | PASS |
|
|
WIP: No ESC issues at this time
|
ESC14-00695
| Aging Inspection | 5/6/2015 | 5/6/2015 | 5/6/2015 9:38:44 AM | | PASS |
|
|
|
ESC14-00695
| DOC - Permit Finaled | 5/6/2015 | 5/6/2015 | 5/6/2015 9:38:14 AM | P | PASS |
|
|
Exterior work complete. Disturbed areas re-vegetated. Other permits are open, but ESC Requirements met
|
ESC14-00911
| Aging Inspection | 5/6/2015 | 5/6/2015 | 5/6/2015 9:31:04 AM | | PASS |
|
|
WIP: perm vegetation needs to be established. No ESC issues at this time
|
ESC15-00306
| Complaint Inspection | 5/6/2015 | 5/6/2015 | 5/6/2015 9:14:43 AM | A | PASS |
|
|
Complaint called in from Boise PW: contactor called and stated from excavating sand, sand entered a nearby Drop Inlet and it plugged, causing back up
Cause: United water flushed a nearby Fire Hydrant into the MS4 causing the Stormwater Pond inside the Park to Flood causeing minor Erosion. Not contractors fault. ACHD needs to contact United Water To WARN them about flushing in area, which will cause flooding inside the park
|
ESC15-00302
| Complaint Inspection | 5/6/2015 | 5/6/2015 | 5/6/2015 8:48:23 AM | A | CANC |
|
|
Data Entry Error
|
ESC15-00421
| Site Preparation | 5/5/2015 | 5/6/2015 | 5/6/2015 8:44:27 AM | A | FAIL |
|
|
TJ Phone #: ###-####
Permit isn't Posted Pool area has already been excavated and plumbed prior to Site Prep Inspection. Corrections: 1.) Post Permit 2.) Have Site Maps onsite 3.) Sweep Parking area directly infront of site
|