ESC16-00823
| Site Preparation | 7/11/2016 | 7/11/2016 | 7/11/2016 3:09:43 PM | P | PASS |
|
|
Bill Phone #: ###-####
Permit Posted On Flat Lot. Approved for Construction
|
ESC16-00774
| Site Preparation | 7/11/2016 | 7/11/2016 | 7/11/2016 3:08:48 PM | P | PASS |
|
|
Bill Phone #: ###-####
Permit Posted on Flat Lot Approved for construction
|
ESC14-00432
| General Inspection | 7/11/2016 | 7/11/2016 | 7/11/2016 2:54:15 PM | | PART |
|
|
Minor trackout that needs to be swept up out of the curb and some areas of the sidewalks
|
ESC16-00743
| Site Preparation | 7/11/2016 | 7/11/2016 | 7/11/2016 1:27:49 PM | P | PASS |
|
|
Walt Phone #: ###-####
Permit Posted on Flat Lot. Concrete washout will be dug once excavator gets onsite. Approved for construction
|
ESC15-00547
| General Inspection | 7/11/2016 | 7/11/2016 | 7/11/2016 1:04:03 PM | | PASS |
|
|
WIP: no esc issues observed at this time. no discharges observed at time of inspection
|
ESC14-00626
| Aging Inspection | 7/11/2016 | 7/11/2016 | 7/11/2016 12:30:36 PM | | PEND |
|
|
re-veg near completion
|
ESC13-00806
| General Inspection | 7/11/2016 | 7/11/2016 | 7/11/2016 11:45:58 AM | | PASS |
|
|
work slowly in progress. no discharges leaving the site
|
ESC11-00879
| General Inspection | 7/11/2016 | 7/11/2016 | 7/11/2016 11:11:35 AM | | PASS |
|
|
|
ESC12-00403
| General Inspection | 7/11/2016 | 7/11/2016 | 7/11/2016 8:10:01 AM | | PASS |
|
|
near completion without issues observed
|