ESC13-00064
| Random Inspection | 5/10/2013 | 5/10/2013 | 5/10/2013 2:15:35 PM | P | FAIL |
|
|
Perimeter control needs installed in back and disturbance from roof drain install stabilized. Clean out down gradient storm drain on east side of alto via.
|
ESC13-00363
| Site Preparation | 5/9/2013 | 5/10/2013 | 5/10/2013 2:11:29 PM | A | PASS |
|
|
Requested by contractor to see pre-existing erosion control problems at site. Perimeter controls in place and entrance scheduled to go in tomorrow. call Tim with results ###-####. Wattle installed on back slope and berm was left in place at edge of property. signage posted. small washout pool at front; spoke with foundation guy and he will use driveway for washing out in. Will call neighbor (ESC13-00064) to clean out storm drain located across the street because it looks like it's been dirty for longer than this project has been active.
|
ESC39-00001
| General Inspection | 5/10/2013 | 5/10/2013 | 5/10/2013 7:15:38 AM | | CANC |
|
|
39 case
|
ESC39-00001
| DOC - Permit Finaled | 5/10/2013 | 5/10/2013 | 5/10/2013 7:15:27 AM | A | PASS |
|
|
|