PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Thursday, January 19, 2017
.
Number of inspections:
14
Percentage of inspections complete:
50 %
Percentage of inspections not complete:
50 %
Contact Information
Inspector
Melissa Jannusch
Title
EROSION INSPECTOR
Phone #
789-3996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC15-00976
General Inspection
1/12/2017
1/12/2017
ESC14-00657
General Inspection
1/16/2017
1/16/2017
ESC16-00159
General Inspection
1/17/2017
1/17/2017
ESC15-00306
General Inspection
1/18/2017
1/18/2017
ESC15-00762
General Inspection
1/18/2017
1/18/2017
ESC16-00288
General Inspection
1/18/2017
1/18/2017
ESC15-01579
General Inspection
1/19/2017
1/19/2017
1/23/2017 4:01:11 PM
PEND
Flooding due to Suez water leak. Site SW infiltration system not yet complete. Areas of the site are under standing water. Working on dewatering plan and containing the sediment from runoff. Currently no water is discharging to the River or walling creek. Water is ponding in grassy area near greenbelt and in onsite swale which is currently overtopping. Check in on mixer contaiment and ecopan clean up (full of water).
ESC15-01210
General Inspection
1/19/2017
1/19/2017
1/19/2017 3:53:57 PM
P
PASS
ESC16-00406
General Inspection
1/19/2017
1/19/2017
1/19/2017 3:51:36 PM
P
PART
On 8th street extention the water drainage has cut in under the berm and is flowing over the ECBs depositing dirt on the ECBs. This water is then flowing Hulls Gulch ravine. Requst to have engineer review design and request corrective action.
On the West side of the site the water flowing from Baremere and highland view Dr. is being channeled by the wattles and creating rill erosion of the slope. Request review, maintenance, and possibly rerouting water.
Notified RP of the observations. RP to provide update of corrective actions to be implemented. Site currently under snow covered/frozen conditions with some active runoff.
ESC16-00349
General Inspection
1/19/2017
1/19/2017
1/19/2017 2:14:11 PM
CANC
No changes since last inspection. Snow covered conditions
ESC16-00353
General Inspection
1/19/2017
1/19/2017
1/19/2017 2:12:02 PM
P
PASS
No activity. Snow covered conditions. No muddy run off.
ESC11-00879
General Inspection
1/19/2017
1/19/2017
1/19/2017 1:45:18 PM
P
PEND
Damaged perimneter control wattles. Make sure these are replaced before construction begins. DI bag removed for mesa grande to allow for snow melt to drain. No muddy discharges occuring.
ESC16-00852
Aging Inspection
1/19/2017
1/19/2017
1/19/2017 1:22:42 PM
CANC
Snow covered ground will check for stabilization after melt. BLDR already finaled.
ESC15-01543
General Inspection
1/19/2017
1/19/2017