Inspections for the day of: Tuesday, January 24, 2017.
Number of inspections: 19
Percentage of inspections complete: 58 %
Percentage of inspections not complete: 42 %
Contact Information
InspectorMelissa Jannusch
TitleEROSION INSPECTOR
Phone #789-3996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-00159 General Inspection1/17/20171/17/2017   
ESC15-00306 General Inspection1/18/20171/18/2017   
ESC15-00762 General Inspection1/18/20171/18/2017   
ESC16-00288 General Inspection1/18/20171/18/2017   
ESC15-01543 General Inspection1/19/20171/19/2017   
ESC15-00142 General Inspection1/20/20171/20/2017   
ESC16-00225 General Inspection1/20/20171/20/2017   
ESC16-00603 General Inspection1/20/20171/20/2017   
ESC16-00683 General Inspection1/24/20171/24/20171/27/2017 10:49:11 AM CANC
Road closed due to landslide and adverse winter conditions
ESC16-00439 General Inspection1/24/20171/24/20171/27/2017 9:34:31 AM PASS
No WIP. Snow covered conditions. Some stock piles located on site.
ESC16-01560 Site Preparation1/19/20171/24/20171/24/2017 5:47:41 PMPFAIL
1:30 PM meeting to go over futuer development plans including utiliites & infrastructure.

Derwater activites causing turbid discharge into swale which outlets into pond in MA williams park. Added riser on outlet of sedimentation ponds to slow velocity of water outletting to swale. Status pending on design of dewatering system. The ponds may not have enough retention time to adequatly seattle particles.
ESC16-00120 DOC - Permit Finaled1/24/20171/24/20171/24/2017 3:44:19 PMPPASS
All permits finaled. Home landscaped and occupied. ESC approved.
ESC16-00145 Site Final1/24/20171/24/20171/24/2017 3:43:16 PMPPASS
All permits finaled. Home landscaped and occupied. ESC approved.
ESC16-00117 Aging Inspection1/24/20171/24/20171/24/2017 3:39:55 PM PASS
framing in progress. driveway poured. trash contained. No trackout.
ESC16-01291 Site Preparation1/23/20171/24/20171/24/2017 3:25:43 PMAPASS
Joey Phone #: ###-####
DI protected. Requested cleaning of sediment bags once the ice melts. Sign posted. Stagging area looks good. Pollution prevention measure in place. Talked with Joey about concrete washout. It is located at existing dallas harris #4 site garage nearby.
ESC16-01290 Site Preparation1/23/20171/24/20171/24/2017 3:24:49 PMAPASS
Joey Phone #: ###-####
DI protected. Requested cleaning of sediment bags once the ice melts. Sign posted. Stagging area looks good. Pollution prevention measure in place. Talked with Joey about concrete washout. It is located at existing dallas harris #4 site garage nearby.
ESC16-01289 Site Preparation1/23/20171/24/20171/24/2017 3:24:02 PMAPASS
Joey Phone #: ###-####
DI protected. Requested cleaning of sediment bags once the ice melts. Sign posted. Stagging area looks good. Pollution prevention measure in place. Talked with Joey about concrete washout. It is located at existing dallas harris #4 site garage nearby.
ESC16-01288 Site Preparation1/23/20171/24/20171/24/2017 3:23:05 PMAPASS
Joey Phone #: ###-####. DI protected. Requested cleaning of sediment bags once the ice melts. Sign posted. Stagging area looks good. Pollution prevention measure in place. Talked with Joey about concrete washout. It is located at existing dallas harris #4 site garage nearby.
ESC15-01579 General Inspection1/23/20171/24/20171/24/2017 2:54:35 PMPPART
Follow up with dewatering operation. dewatering onsite drainage has eliminated need for dewatering operation. Spoke with Jason of J.E.C and Mike RP about perimeter control fixes, cleaning dirt on greenbelt, stagging area with pollution pervention measures in place, and continued trash clean up/ good house keeping. No track out observed, no offsite discharges.