PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Thursday, January 26, 2017
.
Number of inspections:
7
Percentage of inspections complete:
43 %
Percentage of inspections not complete:
57 %
Contact Information
Inspector
Melissa Jannusch
Title
EROSION INSPECTOR
Phone #
789-3996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC15-01543
General Inspection
1/19/2017
1/19/2017
ESC15-00142
General Inspection
1/20/2017
1/20/2017
ESC16-00225
General Inspection
1/20/2017
1/20/2017
ESC16-00603
General Inspection
1/20/2017
1/20/2017
ESC15-01175
General Inspection
1/26/2017
1/26/2017
2/1/2017 12:53:32 PM
PASS
ESC14-00206
General Inspection
1/26/2017
1/26/2017
1/27/2017 9:26:36 AM
PASS
No WIP snow covered conditions. DI bags still in on Deer Ridge Rd. Currently frozen check back once thawed for removal. Concrete washout materials appear to have been removed. Streets are clean and snow plowed.
ESC16-01560
General Inspection
1/26/2017
1/26/2017
1/26/2017 12:14:57 PM
P
PASS
Met with Luke (ACHD ESC) and Zack (RP) to preform turidity testing. Took several samples at various locations throughout the dewatering treatment. at the last serdimentation pond, outlet into swale and the outlet into the pond it ranged between 11-14 NTU. In the first sedimentation pond the reading were between 51-80 NTU.
The system is reducing the turbidity.
Turned off the stationary pump to reduce water flow.