ESC16-00406
| General Inspection | 2/10/2017 | 2/10/2017 | 2/10/2017 4:35:11 PM | P | PASS |
|
|
8th street extension ECB have been replaced and the rip rap channel has been raised to prevent water from cutting down the slope. It appears some water and sediment have overtopped the channel but the ECB are providing ample stabilization. No correction requested.
|
ESC16-01608
| Site Preparation | 2/10/2017 | 2/10/2017 | 2/10/2017 3:07:39 PM | P | PASS |
|
|
Talked with RP. Suggested adding construction entrance. Suggested having a street sweeper on a schedule to prevent track out. Natural vegetation in back of site should prevent muddy run off from site, but there are some wattles on site in case they are needed. Subdivision BMPs are in. Talked with RP about frequently checking DI bags because of clogging due to safety sand. Portta-potty will be delivered Monday. Sign is posted. Okay to start. Next inspection: Check to make sure concrete washout is installed and in use.
|
ESC15-00403
| General Inspection | 2/10/2017 | 2/10/2017 | 2/10/2017 2:30:07 PM | | PASS |
|
|
Small amount of work in parking lot. Small amount of trackout. Make sure this is cleaned before final. Surrounding vegetation is mature.
|
ESC16-00723
| General Inspection | 2/10/2017 | 2/10/2017 | 2/10/2017 2:15:01 PM | | PASS |
|
|
No trackout, silt fence in place, no dirt on sidewalk surrounding project. No corrections
|
ESC15-01184
| General Inspection | 2/10/2017 | 2/10/2017 | 2/10/2017 2:05:49 PM | P | PASS |
|
|
|
ESC15-01175
| General Inspection | 2/10/2017 | 2/10/2017 | 2/10/2017 12:47:51 PM | | PASS |
|
|
|
ESC15-00862
| General Inspection | 2/10/2017 | 2/10/2017 | 2/10/2017 12:26:52 PM | P | PASS |
|
|
Building is finished. Backyard slope is stabilized with grass only. Wattles are still in place above back yard retaining wall.
|
ESC13-00806
| General Inspection | 2/10/2017 | 2/10/2017 | 2/10/2017 12:21:07 PM | | PASS |
|
|
Silt fence has been removed. No issues observed on backside slope. No trackout. No corrections Next inspection: Bring new permit sign. The sign is weather beaten and unreadable.
|
ESC13-01279
| Tracking Control | 2/10/2017 | 2/10/2017 | 2/10/2017 8:55:58 AM | A | PASS |
|
|
Track out has been cleaned, construction entrance has been made, and concrete washouts are on site.
|
ESC16-01498
| Site Preparation | 2/9/2017 | 2/10/2017 | 2/10/2017 8:37:40 AM | A | PASS |
|
|
Okay to start. Subdivision BMPs are in place. Subdivision track out is minimal and sidewalks have been cleaned No corrections
|