Inspections for the day of: Friday, February 10, 2017.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMelissa Jannusch
TitleEROSION INSPECTOR
Phone #789-3996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-00406 General Inspection2/10/20172/10/20172/10/2017 4:35:11 PMPPASS
8th street extension ECB have been replaced and the rip rap channel has been raised to prevent water from cutting down the slope. It appears some water and sediment have overtopped the channel but the ECB are providing ample stabilization.
No correction requested.
ESC16-01608 Site Preparation2/10/20172/10/20172/10/2017 3:07:39 PMPPASS
Talked with RP. Suggested adding construction entrance. Suggested having a street sweeper on a schedule to prevent track out. Natural vegetation in back of site should prevent muddy run off from site, but there are some wattles on site in case they are needed. Subdivision BMPs are in. Talked with RP about frequently checking DI bags because of clogging due to safety sand. Portta-potty will be delivered Monday. Sign is posted. Okay to start.
Next inspection: Check to make sure concrete washout is installed and in use.
ESC15-00403 General Inspection2/10/20172/10/20172/10/2017 2:30:07 PM PASS
Small amount of work in parking lot. Small amount of trackout. Make sure this is cleaned before final. Surrounding vegetation is mature.
ESC16-00723 General Inspection2/10/20172/10/20172/10/2017 2:15:01 PM PASS
No trackout, silt fence in place, no dirt on sidewalk surrounding project.
No corrections
ESC15-01184 General Inspection2/10/20172/10/20172/10/2017 2:05:49 PMPPASS
ESC15-01175 General Inspection2/10/20172/10/20172/10/2017 12:47:51 PM PASS
ESC15-00862 General Inspection2/10/20172/10/20172/10/2017 12:26:52 PMPPASS
Building is finished. Backyard slope is stabilized with grass only. Wattles are still in place above back yard retaining wall.
ESC13-00806 General Inspection2/10/20172/10/20172/10/2017 12:21:07 PM PASS
Silt fence has been removed. No issues observed on backside slope. No trackout. No corrections
Next inspection: Bring new permit sign. The sign is weather beaten and unreadable.
ESC13-01279 Tracking Control2/10/20172/10/20172/10/2017 8:55:58 AMAPASS
Track out has been cleaned, construction entrance has been made, and concrete washouts are on site.
ESC16-01498 Site Preparation2/9/20172/10/20172/10/2017 8:37:40 AMAPASS
Okay to start. Subdivision BMPs are in place. Subdivision track out is minimal and sidewalks have been cleaned
No corrections