Inspections for the day of: Monday, February 13, 2017.
Number of inspections: 22
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMelissa Jannusch
TitleEROSION INSPECTOR
Phone #789-3996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-00779 General Inspection2/13/20172/13/20172/15/2017 10:27:02 AM CANC
ESC14-00788 Aging Inspection2/13/20172/13/20172/15/2017 10:26:49 AM CANC
ESC16-00606 General Inspection2/13/20172/13/20172/15/2017 10:25:56 AM CANC
ESC15-01067 General Inspection2/13/20172/13/20172/15/2017 10:25:39 AM CANC
ESC15-00951 Aging Inspection2/13/20172/13/20172/14/2017 4:58:52 PM CANC
ESC16-00768 General Inspection2/13/20172/13/20172/14/2017 4:24:59 PM PASS
No trackout. Sign posted. No ESC corrections.
ESC16-00599 General Inspection2/13/20172/13/20172/14/2017 4:17:27 PM PASS
Appears to be almost complete BLD permit still open. Can close once BLD is finaled.
ESC16-01253 Tracking Control2/6/20172/13/20172/14/2017 3:07:09 PMAPASS
Trakout has been addressed.
ESC16-00208 General Inspection2/13/20172/13/20172/13/2017 5:29:14 PM PASS
ESC15-00729 General Inspection2/13/20172/13/20172/13/2017 5:20:19 PMPPASS
Water is discharging into warm springs creek is clean no plume detected. Met with (RP) Cody on site and talked about contingency settling on the site in case discharge becomes muddy.
ESC16-01727 Site Preparation2/13/20172/13/20172/13/2017 5:19:26 PMPPASS
Phone #: ###-#### Inspection requested via web by Braxton Hansen
ESC16-00859 Site Final2/10/20172/13/20172/13/2017 4:05:25 PMPPASS
Okay to final
ESC15-00746 Aging Inspection2/13/20172/13/20172/13/2017 4:00:31 PM PASS
ESC16-01401 Tracking Control2/8/20172/13/20172/13/2017 3:10:50 PMPPASS
ESC17-00061 Site Preparation2/13/20172/13/20172/13/2017 2:33:41 PMPPASS
Spoke with Seth (RP) about project. Minimal earthwork will be occurring and dirt will be contained on site. Yard landscaping will prevent runoff. Sign is posted. Okay to start.
ESC15-00860 Aging Inspection2/13/20172/13/20172/13/2017 1:52:57 PM PASS
No corrections
ESC16-01167 General Inspection2/13/20172/13/20172/13/2017 1:46:39 PMPPASS
Met with Rocky (RP) on site. There are 4 wells dewatering the site. A frack tank is being used to settle particles before entering the cottonwood flume. The SWPPP is available and up to date. Strata is monitoring the discharge into the flume and measuring turbidity NTUs. These reports will be included in the SWPPP. No corrections.

ESC13-00690 Aging Inspection2/13/20172/13/20172/13/2017 1:11:41 PM PASS
Final vegetation has been reached. Need to remove remaining BMPs.
Left message with RP to remove remaining BMPs so a site final can be done.
ESC15-00731 General Inspection2/13/20172/13/20172/13/2017 11:23:50 AM PASS
ESC16-00499 General Inspection2/13/20172/13/20172/13/2017 11:02:47 AM PART
Track out onto side walk. Wattle has moved onto sidewalk. Permit sign not visible. Staked permit sign in front yard. Called RP and left a message requesting corrections
Corrections requested: Sweep up sidewalk, Re-install and/or replace perimeter wattle
Follow up scheduled: 2/20
ESC15-00853 Tracking Control2/10/20172/13/20172/13/2017 10:37:16 AMPPASS
check that messy access drive has been swept.

if not.
Has been cleaned.
ESC15-00976 General Inspection2/13/20172/13/20172/13/2017 10:19:44 AM PASS