Inspections for the day of: Monday, February 6, 2017.
Number of inspections: 20
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMelissa Jannusch
TitleEROSION INSPECTOR
Phone #789-3996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-00142 General Inspection2/6/20172/6/20172/8/2017 4:36:06 PM PASS
Driveway complete. WIP on interior. No activity on backside slope. No ESC corrections.
ESC16-00225 General Inspection2/6/20172/6/20172/8/2017 12:21:54 PM PEND
RP addressing rill and sediment runoff from the site. They are using dandy bags to protect inlets. Planning to clean DIs. Eric (RP) is aware of erosion problems and will making a plan of action moving forward to stabilize the slopes. He is currently working to remove sediment from the sidewalks and streets. Will follow up next week with additional corrections.
ESC13-01279 General Inspection2/6/20172/6/20172/8/2017 9:32:22 AM PART
Track out from site onto mill station and caddis right up to Eckert.
Correction request: Called RP. Heplans to clean and sweep. Suggested improving construction entrance.
ESC15-01078 Site Final2/6/20172/6/20172/6/2017 4:56:58 PMPPASS
ESC15-01078 Aging Inspection2/6/20172/6/20172/6/2017 4:56:42 PM PASS
Vegetation is mature. Okay to final
ESC16-00036 General Inspection2/6/20172/6/20172/6/2017 4:41:51 PM PASS
No corrections. BLD still open. Small patch of diveway still not paved.
ESC16-00115 Aging Inspection2/6/20172/6/20172/6/2017 4:23:40 PM PASS
ESC16-01555 Site Preparation2/6/20172/6/20172/6/2017 3:27:36 PMPPASS
Phone #: ###-#### Inspection requested via web by Braxton Hansen

Sign is posted and visible. Subdivision BMPs are in place. Subdivision trackout has been addressed from previous request. Okay to start.
Talked with Braxton RP about potentially adding BMPs along the drainage channel next to the site to prevent equipment and /or stockpiling from causing sediment to enter the drainage channel.

Okay to start.
ESC16-01501 Random Inspection2/6/20172/6/20172/6/2017 2:20:17 PMPPASS
Concrete washout has been cleaned out per previous correction request.
Correction request: Spoke with Clint (RP) about track out issues due to the heavy precipitation. He has a street sweeper scheduled for Friday.
ESC16-01517 Site Preparation2/3/20172/6/20172/6/2017 2:19:11 PMAPASS
Clint Phone #: ###-####.
Concrete washout has been cleaned out per previous correction request. East Valley sub BMPs in place. Spoke with Clint (RP) about potential track out issues due to the heavy precipitation. Has street sweeper scheduled for Friday. No corrections. Okay to start.
ESC15-00863 Aging Inspection2/6/20172/6/20172/6/2017 12:01:24 PM PASS
WIP. No track out, sign visible.
No corrections
ESC16-01432 Site Preparation2/3/20172/6/20172/6/2017 11:47:33 AMAPASS
Robert Phone #: ###-####
Talked with Robert Silva (RP) plans to use subdivision BMPs that are already in place for the SFH. Permit sign is visible. They plan to start work on Thursday 2/9/17.
Next inspection ensure concrete washout and staging area are being used. Check to ensure no trackout is occurring.
ESC17-00035 Site Preparation2/3/20172/6/20172/6/2017 11:43:44 AMAPASS
Robert Phone #: ###-####.
Talked with Robert Silva (RP) plans to use subdivision BMPs that are already in place for this pool project. They plan to start work on the pool on Thursday 2/9/17.
No correction requested.
ESC16-00349 Site Final2/6/20172/6/20172/6/2017 11:14:13 AMPPASS
ESC16-00349 General Inspection2/6/20172/6/20172/6/2017 11:13:53 AM PASS
Final vegetation in place. Okay to final.
ESC16-00353 General Inspection2/6/20172/6/20172/6/2017 11:03:16 AM PART
SWPPP and permit sign are visible. Subdivision BMPs are in place. No current WIP. Gatergaurds are working effectively at preventing runoff from lot entry ways. No trackout.

Correction Requested: There is rill erosion occurring on the west side of the sidewalk about half way up the road. Which is depositing a good amount of soil onto the sidewalk. Left message with Cameron Jayo requesting additional BMPs in the problem area to slow water and sediment, and requested cleanup of the soil on the sidewalk.
ESC15-00944 General Inspection2/6/20172/6/20172/6/2017 10:33:17 AM NR
No WIP. Project does not appear to have started. Snow covered conditions.
ESC15-00811 Aging Inspection2/6/20172/6/20172/6/2017 10:18:05 AM PASS
No trackout. Snow covered conditions cannot confirm final vegetation to final.
ESC16-00434 General Inspection2/6/20172/6/20172/6/2017 9:57:25 AM PASS
Clean work site. Sign posted
ESC16-00414 General Inspection2/6/20172/6/20172/6/2017 9:36:13 AM PASS
Silt fence in place. Building is finished. Final vegetation not established yet.