Inspections for the day of: Thursday, February 9, 2017.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMelissa Jannusch
TitleEROSION INSPECTOR
Phone #789-3996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-00841 General Inspection1/31/20172/9/20172/10/2017 8:15:53 AMPPART
Track out has been addressed. Construction entrance is paved and cleaned. DI bags are still full.
Corrections addressed: Track out, construction entrance
Corrections still needed: DI bags on both sides of Millett Dr. need to be emptied
ESC16-00879 General Inspection2/8/20172/9/20172/9/2017 4:40:34 PMPCANC
ESC16-01276 Random Inspection2/9/20172/9/20172/9/2017 3:52:12 PMPPASS
No WIP. Paved construction entrance. Wattles along perimeter. DI bags are good. Sign is posted. No Corrections
ESC16-00427 General Inspection2/9/20172/9/20172/9/2017 3:50:59 PM PASS
Final stabilization has not been reached. Not ready to final.
ESC16-00156 General Inspection2/8/20172/9/20172/9/2017 3:35:52 PMPPART
Corrections requested: Clean trash on sidewalk, remove dirt from side walk, clean out DI bags

Talked with Brett (RP) on site. He plans to work on corrections.
ESC16-00696 General Inspection2/8/20172/9/20172/9/2017 2:40:19 PMPPASS
The inlet bags have been cleaned. Parking lot is now paved and being used as construction entrance. Sign is posted. Abram is clean of construction trackout only dirty from safety sand. No corrections.
ESC16-00697 General Inspection2/9/20172/9/20172/9/2017 2:39:55 PM PASS
The inlet bags have been cleaned. Parking lot is now paved and being used as construction entrance. Sign is posted. Abram is clean of construction trackout only dirty from safety sand. No corrections.
ESC16-01494 Site Preparation2/8/20172/9/20172/9/2017 1:55:48 PMPPASS
Sign now is posted. Using paved part of lot for construction enterance. okay to start.
ESC16-00537 Site Final2/9/20172/9/20172/9/2017 1:22:34 PMPPASS
ESC16-00502 General Inspection2/9/20172/9/20172/9/2017 1:13:31 PMPPASS
WIP site is muddy but no discharge. Sign is posted
House is complete. Final stabilization has not been reached.
ESC16-00572 Site Final2/9/20172/9/20172/9/2017 1:05:52 PMPPASS
ESC16-00693 Site Final2/9/20172/9/20172/9/2017 12:55:10 PMPPASS
Part of driveway is gravel, but it is stabilized. okay to final