ESC16-00841
| General Inspection | 1/31/2017 | 2/9/2017 | 2/10/2017 8:15:53 AM | P | PART |
|
|
Track out has been addressed. Construction entrance is paved and cleaned. DI bags are still full. Corrections addressed: Track out, construction entrance Corrections still needed: DI bags on both sides of Millett Dr. need to be emptied
|
ESC16-00879
| General Inspection | 2/8/2017 | 2/9/2017 | 2/9/2017 4:40:34 PM | P | CANC |
|
|
|
ESC16-01276
| Random Inspection | 2/9/2017 | 2/9/2017 | 2/9/2017 3:52:12 PM | P | PASS |
|
|
No WIP. Paved construction entrance. Wattles along perimeter. DI bags are good. Sign is posted. No Corrections
|
ESC16-00427
| General Inspection | 2/9/2017 | 2/9/2017 | 2/9/2017 3:50:59 PM | | PASS |
|
|
Final stabilization has not been reached. Not ready to final.
|
ESC16-00156
| General Inspection | 2/8/2017 | 2/9/2017 | 2/9/2017 3:35:52 PM | P | PART |
|
|
Corrections requested: Clean trash on sidewalk, remove dirt from side walk, clean out DI bags
Talked with Brett (RP) on site. He plans to work on corrections.
|
ESC16-00696
| General Inspection | 2/8/2017 | 2/9/2017 | 2/9/2017 2:40:19 PM | P | PASS |
|
|
The inlet bags have been cleaned. Parking lot is now paved and being used as construction entrance. Sign is posted. Abram is clean of construction trackout only dirty from safety sand. No corrections.
|
ESC16-00697
| General Inspection | 2/9/2017 | 2/9/2017 | 2/9/2017 2:39:55 PM | | PASS |
|
|
The inlet bags have been cleaned. Parking lot is now paved and being used as construction entrance. Sign is posted. Abram is clean of construction trackout only dirty from safety sand. No corrections.
|
ESC16-01494
| Site Preparation | 2/8/2017 | 2/9/2017 | 2/9/2017 1:55:48 PM | P | PASS |
|
|
Sign now is posted. Using paved part of lot for construction enterance. okay to start.
|
ESC16-00537
| Site Final | 2/9/2017 | 2/9/2017 | 2/9/2017 1:22:34 PM | P | PASS |
|
|
|
ESC16-00502
| General Inspection | 2/9/2017 | 2/9/2017 | 2/9/2017 1:13:31 PM | P | PASS |
|
|
WIP site is muddy but no discharge. Sign is posted House is complete. Final stabilization has not been reached.
|
ESC16-00572
| Site Final | 2/9/2017 | 2/9/2017 | 2/9/2017 1:05:52 PM | P | PASS |
|
|
|
ESC16-00693
| Site Final | 2/9/2017 | 2/9/2017 | 2/9/2017 12:55:10 PM | P | PASS |
|
|
Part of driveway is gravel, but it is stabilized. okay to final
|