ESC16-01645
| BMP Violation | 3/10/2017 | 3/13/2017 | 3/14/2017 9:49:20 AM | P | PART |
|
|
DI protection is installed. WIP. Trackout is occurring. Continue to monitor trackout. Project okay.
|
ESC16-00489
| General Inspection | 3/13/2017 | 3/13/2017 | 3/13/2017 4:03:36 PM | | PASS |
|
|
WIP on SFH. DIs and subdivision BMPs are okay. No corrections requested.
|
ESC14-00989
| General Inspection | 3/13/2017 | 3/13/2017 | 3/13/2017 3:51:38 PM | | PASS |
|
|
Soil is stabilized around building. Okay to final once BLD has final.
|
ESC16-01561
| Random Inspection | 3/13/2017 | 3/13/2017 | 3/13/2017 3:36:12 PM | P | PASS |
|
|
Dewatering operation is ongoing. There is no visible plume entering walling creek or the wetland. The discharge is too great for the spillways and the second spillways BMPs are no longer providing residence time or filtration. At the end of the site the water is sheet flowing through the riparian area into walling creek. This discharge appears clean.
|
ESC14-01083
| General Inspection | 3/13/2017 | 3/13/2017 | 3/13/2017 3:35:16 PM | | PASS |
|
|
WIP. No ESC issues observed.
|
ESC15-01588
| Aging Inspection | 3/13/2017 | 3/13/2017 | 3/13/2017 2:34:57 PM | | PASS |
|
|
No ESC issues observed
|
ESC15-00546
| General Inspection | 3/13/2017 | 3/13/2017 | 3/13/2017 10:38:11 AM | | PASS |
|
|
Landscaping is complete. WIP on interior.
|
ESC16-01404
| BMP Violation | 3/6/2017 | 3/13/2017 | 3/13/2017 10:26:22 AM | A | PART |
|
|
Trackout swept up. Signs still not posted.
|
ESC16-00427
| General Inspection | 3/13/2017 | 3/13/2017 | 3/13/2017 10:26:22 AM | | PASS |
|
|
Bridge is complete. Vegetation cover is nearly complete. okay
|
ESC16-01478
| General Inspection | 3/13/2017 | 3/13/2017 | 3/13/2017 9:44:27 AM | P | PASS |
|
|
Foundations poured. No ESC issues observed. Signs are posted.
|
ESC16-01479
| General Inspection | 3/13/2017 | 3/13/2017 | 3/13/2017 9:44:16 AM | P | PASS |
|
|
Foundations poured. No ESC issues observed. Signs are posted.
|
ESC16-01475
| General Inspection | 3/13/2017 | 3/13/2017 | 3/13/2017 9:44:03 AM | P | PASS |
|
|
Foundations poured. No ESC issues observed. Signs are posted.
|
ESC16-01476
| General Inspection | 3/13/2017 | 3/13/2017 | 3/13/2017 9:43:52 AM | P | PASS |
|
|
Foundations poured. No ESC issues observed. Signs are posted.
|
ESC15-01179
| Site Final | 3/13/2017 | 3/13/2017 | 3/13/2017 9:43:16 AM | P | PASS |
|
|
|
ESC15-01179
| Aging Inspection | 3/13/2017 | 3/13/2017 | 3/13/2017 9:43:03 AM | | PASS |
|
|
Okay to final
|
ESC16-00439
| General Inspection | 3/13/2017 | 3/13/2017 | 3/13/2017 9:21:54 AM | | PASS |
|
|
Some track out. Talked with RP last Friday during a site preparation inspection. He has a sweeper scheduled for this week. okay
|