ESC17-00055
| Site Preparation | 3/2/2017 | 3/2/2017 | 3/2/2017 4:38:06 PM | P | PASS |
|
|
okay to start
|
ESC13-00193
| General Inspection | 3/2/2017 | 3/2/2017 | 3/2/2017 2:54:48 PM | | PASS |
|
|
No WIP. silt fence still needs repair.
|
ESC16-00757
| Site Final | 3/2/2017 | 3/2/2017 | 3/2/2017 2:44:52 PM | P | PASS |
|
|
|
ESC16-00757
| Aging Inspection | 3/2/2017 | 3/2/2017 | 3/2/2017 2:44:37 PM | | PASS |
|
|
Demolition complete. Okay to final.
|
ESC16-00807
| Aging Inspection | 3/2/2017 | 3/2/2017 | 3/2/2017 2:38:35 PM | | PASS |
|
|
No esc issues.
|
ESC17-00001
| Tracking Control | 2/21/2017 | 3/2/2017 | 3/2/2017 2:14:38 PM | P | PART |
|
|
Piles have been moved. There is still significant trackout along some of Hiawatha Dr.
|
ESC16-00879
| General Inspection | 3/2/2017 | 3/2/2017 | 3/2/2017 1:40:51 PM | P | PASS |
|
|
SWPPP binder up to date. No corrections requested.
|
ESC16-00653
| Site Final | 3/2/2017 | 3/2/2017 | 3/2/2017 1:30:40 PM | P | PASS |
|
|
Okay to final. No more earth work will be occurring.
|
ESC17-00185
| Site Preparation | 3/2/2017 | 3/2/2017 | 3/2/2017 12:59:54 PM | P | PASS |
|
|
Met with RP Doyle on site. Discussed trackout control, trash containment, and runoff prevention. Sign is posted. Okay to start.
|
ESC16-00844
| Aging Inspection | 3/2/2017 | 3/2/2017 | 3/2/2017 11:23:00 AM | | FAIL |
|
|
Trackout onto sidewalk between Trailwood to Honeycomb (Parkcenter 3908,3920,3936,3945,3954,3962,3970,3982). Trackout on honeycomb.
|
ESC16-01561
| Random Inspection | 3/2/2017 | 3/2/2017 | 3/2/2017 11:02:47 AM | P | PASS |
|
|
Dewatering operation update: Water has filled the site designated for sheet flow and infiltration of the dewatering water as well as the contingency settling site. Two overflow spill ways have been installed that are discharging water into the creek adjacent to the site.
The first over flow spill way is comprised of a dirt berm channel with three wattles to slow water flow and catch sediment. The discharge appears clean with no plume in the creek visible.
The other overflow set up is comprised of a wattle slowing discharge from the site. The water then enters a pipe. The outlet to the pipe has plastic sheeting underneath it to prevent scour/erosion at the outlet. There is another wattle placed at the bottom of the plastic sheet to slow the water and catch the sediment before the discharge enters the stream. The water appears clean with no plume visible.
The RP should update the SWPPP to reflect changes to the dewatering plan. At the end of the dewatering operation ensure the BMPs are cleaned up so they do not enter the stream. Left message with RP.
|
ESC16-00965
| Aging Inspection | 3/2/2017 | 3/2/2017 | 3/2/2017 9:55:18 AM | | PASS |
|
|
No issues observed.
|
ESC15-00556
| General Inspection | 3/2/2017 | 3/2/2017 | 3/2/2017 9:45:11 AM | | PASS |
|
|
WIP. Concrete washout in good condition. DI bags okay. No significant trackout. Dirt piles are back from sidewalk and contained on site. No corrections requested.
|
ESC16-01390
| Site Preparation | 2/16/2017 | 3/2/2017 | 3/1/2017 8:26:44 AM | P | CANC |
|
|
|