ESC16-00853
| General Inspection | 3/7/2017 | 3/7/2017 | 3/9/2017 11:42:40 AM | | FAIL |
|
|
Met RP Justin on site. Corrections requested: clean up trackout maintenance on DI filters. Follow up scheduled for next week.
|
ESC15-01248
| Site Final | 3/6/2017 | 3/7/2017 | 3/8/2017 11:51:31 AM | A | PASS |
|
|
|
ESC15-01483
| General Inspection | 3/7/2017 | 3/7/2017 | 3/8/2017 11:25:26 AM | | PASS |
|
|
WIP on exterior and interior. Minimal earthwork occurring. No ESC violations observed.
|
ESC16-01682
| Site Preparation | 3/7/2017 | 3/7/2017 | 3/8/2017 10:31:26 AM | P | PASS |
|
|
Subdivision is clean. No corrections requested.
|
ESC16-00301
| Aging Inspection | 3/7/2017 | 3/7/2017 | 3/8/2017 9:40:16 AM | | PASS |
|
|
Project is finished. Soil is stable. Okay to final
|
ESC16-00525
| Aging Inspection | 3/7/2017 | 3/7/2017 | 3/8/2017 9:31:30 AM | | PASS |
|
|
Project is finished. Soil is stable. Okay to final
|
ESC17-00078
| Site Preparation | 3/7/2017 | 3/7/2017 | 3/8/2017 9:19:51 AM | P | PASS |
|
|
Met on site yesterday morning to discuss project and ESC requirements.
Currently just the construction entrance and sign are installed. These BMPs will be sufficient during the excavation of the lead contaminated soils while the berm is still in place. The remaining BMPs will be installed before the grading and removal of the berm are allowed to begin.
Call for additional site preparation once the additional BMPs have been installed.
No dewatering is anticipated. If dewatering is deemed necessary, a dewatering plan will need to be submitted and an inspection of the dewatering setup will be requested.
|
ESC16-01617
| Site Preparation | 3/6/2017 | 3/7/2017 | 3/7/2017 4:26:19 PM | P | PASS |
|
|
BMPs are all installed. okay to start
|
ESC15-01210
| General Inspection | 3/7/2017 | 3/7/2017 | 3/7/2017 1:39:54 PM | | PASS |
|
|
okay. No trackout.
|
ESC16-00353
| General Inspection | 3/7/2017 | 3/7/2017 | 3/7/2017 1:25:05 PM | P | PASS |
|
|
|
ESC16-00953
| General Inspection | 3/7/2017 | 3/7/2017 | 3/7/2017 1:21:16 PM | | PASS |
|
|
No ESC violations observed. Concrete washout is full.
|
ESC16-00963
| General Inspection | 3/7/2017 | 3/7/2017 | 3/7/2017 1:05:46 PM | | PASS |
|
|
WIP. Terraced landscaping almost complete. Wattles located along downhill perimeter. No trackout. Using existing driveway as a construction entrance.
|
ESC16-00499
| General Inspection | 3/7/2017 | 3/7/2017 | 3/7/2017 12:53:47 PM | | PASS |
|
|
No ESC violations. Final landscaping not yet achieved
|
ESC16-00948
| General Inspection | 3/7/2017 | 3/7/2017 | 3/7/2017 12:22:17 PM | | PASS |
|
|
No ESC violations observed. DIs okay.
|
ESC16-00122
| Site Final | 3/7/2017 | 3/7/2017 | 3/7/2017 12:04:25 PM | P | PASS |
|
|
|
ESC16-00122
| Aging Inspection | 3/7/2017 | 3/7/2017 | 3/7/2017 12:03:59 PM | | PASS |
|
|
Final landscaping is finished. Okay to final
|
ESC16-00286
| Aging Inspection | 3/7/2017 | 3/7/2017 | 3/7/2017 11:43:23 AM | | PASS |
|
|
No ESC violations observed
|
ESC16-01561
| General Inspection | 3/6/2017 | 3/7/2017 | 3/7/2017 10:50:47 AM | A | PASS |
|
|
RP is conducting turbidity testing on discharge points. The channel length through the site has been increased. Additional BMPs have been added to the first discharge point. Overflows are occurring on the North portion of the site near the bridge. The water is overflowing the berms sheet flowing through the vegetation and into the creek. All discharges appear clean. No plume is visible currently. Requested RP ensure the SWPPP is kept up to date and contains the turbidity measurement. Dewatering operation is currently okay.
|
ESC16-01404
| BMP Violation | 3/3/2017 | 3/7/2017 | 3/6/2017 2:41:35 PM | P | FAIL |
|
|
Corrections requested: post permit signs, clean trackout, install concrete washout if needed. Follow up scheduled next week
|
ESC16-00338
| Site Final | 2/28/2017 | 3/7/2017 | 3/6/2017 10:06:12 AM | A | PASS |
|
|
Okay to final
|