Inspections for the day of: Tuesday, March 7, 2017.
Number of inspections: 20
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMelissa Jannusch
TitleEROSION INSPECTOR
Phone #789-3996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-00853 General Inspection3/7/20173/7/20173/9/2017 11:42:40 AM FAIL
Met RP Justin on site. Corrections requested: clean up trackout maintenance on DI filters. Follow up scheduled for next week.
ESC15-01248 Site Final3/6/20173/7/20173/8/2017 11:51:31 AMAPASS
ESC15-01483 General Inspection3/7/20173/7/20173/8/2017 11:25:26 AM PASS
WIP on exterior and interior. Minimal earthwork occurring. No ESC violations observed.
ESC16-01682 Site Preparation3/7/20173/7/20173/8/2017 10:31:26 AMPPASS
Subdivision is clean. No corrections requested.
ESC16-00301 Aging Inspection3/7/20173/7/20173/8/2017 9:40:16 AM PASS
Project is finished. Soil is stable. Okay to final

ESC16-00525 Aging Inspection3/7/20173/7/20173/8/2017 9:31:30 AM PASS
Project is finished. Soil is stable. Okay to final

ESC17-00078 Site Preparation3/7/20173/7/20173/8/2017 9:19:51 AMPPASS
Met on site yesterday morning to discuss project and ESC requirements.

Currently just the construction entrance and sign are installed. These BMPs will be sufficient during the excavation of the lead contaminated soils while the berm is still in place. The remaining BMPs will be installed before the grading and removal of the berm are allowed to begin.

Call for additional site preparation once the additional BMPs have been installed.

No dewatering is anticipated. If dewatering is deemed necessary, a dewatering plan will need to be submitted and an inspection of the dewatering setup will be requested.
ESC16-01617 Site Preparation3/6/20173/7/20173/7/2017 4:26:19 PMPPASS
BMPs are all installed. okay to start
ESC15-01210 General Inspection3/7/20173/7/20173/7/2017 1:39:54 PM PASS
okay. No trackout.
ESC16-00353 General Inspection3/7/20173/7/20173/7/2017 1:25:05 PMPPASS
ESC16-00953 General Inspection3/7/20173/7/20173/7/2017 1:21:16 PM PASS
No ESC violations observed. Concrete washout is full.
ESC16-00963 General Inspection3/7/20173/7/20173/7/2017 1:05:46 PM PASS
WIP. Terraced landscaping almost complete. Wattles located along downhill perimeter. No trackout. Using existing driveway as a construction entrance.
ESC16-00499 General Inspection3/7/20173/7/20173/7/2017 12:53:47 PM PASS
No ESC violations. Final landscaping not yet achieved
ESC16-00948 General Inspection3/7/20173/7/20173/7/2017 12:22:17 PM PASS
No ESC violations observed. DIs okay.
ESC16-00122 Site Final3/7/20173/7/20173/7/2017 12:04:25 PMPPASS
ESC16-00122 Aging Inspection3/7/20173/7/20173/7/2017 12:03:59 PM PASS
Final landscaping is finished. Okay to final
ESC16-00286 Aging Inspection3/7/20173/7/20173/7/2017 11:43:23 AM PASS
No ESC violations observed
ESC16-01561 General Inspection3/6/20173/7/20173/7/2017 10:50:47 AMAPASS
RP is conducting turbidity testing on discharge points. The channel length through the site has been increased. Additional BMPs have been added to the first discharge point. Overflows are occurring on the North portion of the site near the bridge. The water is overflowing the berms sheet flowing through the vegetation and into the creek. All discharges appear clean. No plume is visible currently. Requested RP ensure the SWPPP is kept up to date and contains the turbidity measurement. Dewatering operation is currently okay.
ESC16-01404 BMP Violation3/3/20173/7/20173/6/2017 2:41:35 PMPFAIL
Corrections requested: post permit signs, clean trackout, install concrete washout if needed. Follow up scheduled next week
ESC16-00338 Site Final2/28/20173/7/20173/6/2017 10:06:12 AMAPASS
Okay to final