Inspections for the day of: Monday, April 10, 2017.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMelissa Jannusch
TitleEROSION INSPECTOR
Phone #789-3996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-01481 General Inspection4/3/20174/10/20174/11/2017 4:17:56 PMAPASS
Trackout.No windblown trash. Corrections requested sweep gutter.
ESC16-01420 General Inspection4/3/20174/10/20174/11/2017 4:17:33 PMAPASS
Trackout. No windblown trash. Corrections requested Sweep gutter.
ESC15-01579 General Inspection4/10/20174/10/20174/11/2017 2:53:31 PM PASS
WIP. SWPPP inspections are up to date. Water from high river flows is flowing through corner of the site. Ensure no pollutants are entering this area and being discharged into river water. Two concrete washout nearly full third is ok. Uncovered containers with unknown materials and rain water are uncovered. Dispose of properly and potentially cover if any pollutants are contained in barrels.
Corrections requested: Pick up wind blow trash around perimeter fencing. Repair silt fence. Around perimeter. Clean green belt where fence was run into.
ESC16-00437 General Inspection4/10/20174/10/20174/11/2017 2:53:01 PM PASS
WIP. SWPPP inspections are up to date. Water from high river flows is flowing through corner of the site. Ensure no pollutants are entering this area and being discharged into river water. Two concrete washout nearly full third is ok. Uncovered containers with unknown materials and rain water are uncovered. Dispose of properly and potentially cover if any pollutants are contained in barrels.
Corrections requested: Pick up wind blow trash around perimeter fencing. Repair silt fence. Around perimeter. Clean green belt where fence was run into.
ESC16-00436 General Inspection4/10/20174/10/20174/11/2017 2:53:01 PM PASS
WIP. SWPPP inspections are up to date. Water from high river flows is flowing through corner of the site. Ensure no pollutants are entering this area and being discharged into river water. Two concrete washout nearly full third is ok. Uncovered containers with unknown materials and rain water are uncovered. Dispose of properly and potentially cover if any pollutants are contained in barrels.
Corrections requested: Pick up wind blow trash around perimeter fencing. Repair silt fence. Around perimeter. Clean green belt where fence was run into.


ESC16-00435 General Inspection4/10/20174/10/20174/11/2017 2:53:01 PM PASS
WIP. SWPPP inspections are up to date. Water from high river flows is flowing through corner of the site. Ensure no pollutants are entering this area and being discharged into river water. Two concrete washout nearly full third is ok. Uncovered containers with unknown materials and rain water are uncovered. Dispose of properly and potentially cover if any pollutants are contained in barrels.
Corrections requested: Pick up wind blow trash around perimeter fencing. Repair silt fence. Around perimeter. Clean green belt where fence was run into.
ESC16-00399 General Inspection4/10/20174/10/20174/11/2017 8:29:26 AM CANC
ESC16-00348 General Inspection4/10/20174/10/20174/11/2017 8:28:29 AM CANC
ESC16-00438 Aging Inspection4/10/20174/10/20174/10/2017 4:29:32 PM CANC
ESC15-00863 Aging Inspection4/10/20174/10/20174/10/2017 4:29:04 PM CANC
ESC16-01561 General Inspection4/10/20174/10/20174/10/2017 4:28:35 PMAPASS
Dewatering occurring for last phases of utilities. Water is spilling into walling creek.
ESC16-00509 General Inspection4/10/20174/10/20174/10/2017 4:24:59 PMPPASS
Landscaping complete. Need to sweep staging area and remove equipment before permit can be finaled.
ESC16-00742 General Inspection4/10/20174/10/20174/10/2017 4:24:40 PMPPASS
Landscaping complete. Need to sweep staging area and remove equipment before permit can be finaled.
ESC14-00588 General Inspection4/10/20174/10/20174/10/2017 4:24:14 PMPPASS
Landscaping complete. Need to sweep staging area and remove equipment before permit can be finaled.
ESC15-00729 General Inspection4/10/20174/10/20174/10/2017 12:52:26 PMPPASS
Re seeding is occurring on several slopes. The drainage channel where the check dams were located has been redesigned. There is trackout occurring on some of the SFH lots. No new areas of concern.
ESC17-00078 General Inspection4/10/20174/10/20174/10/2017 12:48:37 PMAPASS
Project inactive no ESC issues observed.
ESC16-00225 General Inspection4/10/20174/10/20174/10/2017 12:38:22 PMPPEND
Large rill adjacent to drainage channel has been filled. Trench has been dug along top of slope to channel water into the drainage channel. Sediment runoff onto sidewalk still occurring.

ESC17-00018 General Inspection4/10/20174/10/20174/10/2017 12:32:59 PMPPASS