Inspections for the day of: Wednesday, April 12, 2017.
Number of inspections: 20
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMelissa Jannusch
TitleEROSION INSPECTOR
Phone #789-3996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-01707 General Inspection4/5/20174/12/20174/13/2017 2:28:31 PMAPASS
WIP on foundation. Concrete washout is in use. Perimeter controls are maintained. No uncontained trash in subdivision project ok. No corrections requested.
ESC16-00914 Tracking Control4/5/20174/12/20174/13/2017 11:20:42 AMAPASS
Construction entrance on grand forest is in good conditions. Ensure this entrance/exit is being used not the entrance into the parking lot off Quamash way. Small amount of trackout still in parking lot.
ESC16-00264 Aging Inspection4/12/20174/12/20174/12/2017 3:23:38 PM PASS
Landscaping not installed yet.
ESC16-00429 Site Final4/12/20174/12/20174/12/2017 3:08:45 PMPPASS
ESC16-00429 Aging Inspection4/12/20174/12/20174/12/2017 3:08:36 PM PASS
Complete. Soil is stable no BMPs remaining. okay to final.
ESC14-01083 General Inspection4/12/20174/12/20174/12/2017 2:59:30 PM CANC
ESC16-00489 General Inspection4/12/20174/12/20174/12/2017 2:59:10 PM PASS
WIP on SFH. DIs ok.
ESC16-00625 General Inspection4/12/20174/12/20174/12/2017 2:10:10 PM PASS
WIP. No ESC violations observed.
ESC16-00705 Site Final4/12/20174/12/20174/12/2017 1:42:35 PMPPASS
ESC16-00705 Site Final4/12/20174/12/20174/12/2017 1:42:25 PMPPASS
ESC16-00705 Aging Inspection4/12/20174/12/20174/12/2017 1:42:15 PM PASS
Soil is stable. No temporary BMPs to remove. Okay to final.
ESC16-01100 General Inspection4/12/20174/12/20174/12/2017 1:05:16 PM PASS
No ESC issues
ESC16-01114 Site Final4/12/20174/12/20174/12/2017 12:28:24 PMPPASS
ESC16-01114 General Inspection4/12/20174/12/20174/12/2017 12:28:02 PM PASS
Project complete. No lose soil. Okay to final.
ESC16-00986 Aging Inspection4/12/20174/12/20174/12/2017 12:10:41 PM PASS
Landscaping not complete. Some windblown trash. Correction requested pick up trash.
ESC16-00659 General Inspection4/12/20174/12/20174/12/2017 9:52:40 AMPPASS
Almost complete. Landscaping has not been installed yet.
ESC16-01056 General Inspection4/12/20174/12/20174/12/2017 9:46:21 AM PASS
Almost complete. Landscaping has not been installed yet.
ESC17-00326 Site Preparation4/11/20174/12/20174/12/2017 9:10:53 AMAPASS
Bryan Phone #: ###-####
Sign is posted. Concrete washout pit has been dug RP will line with plastic. Reminded RP to watch for trackout and to contain windblown trash.
ESC17-00235 Site Preparation4/11/20174/12/20174/12/2017 9:07:52 AMAPASS
Rollo Phone #: ###-####
BMPs are installed per plan. Gave RP signs to post at sites. Okay to start.
ESC17-00105 Site Preparation4/11/20174/12/20174/12/2017 9:07:12 AMAPASS
John Phone #: ###-####
Project has already started. Called RP and reminded him to call in site preps before work begins. Concrete washout on site, sign is posted. Ensure trash containment is installed. Reminded RP to prevent windblown trash and trackout. Okay to start.