ESC16-01707
| General Inspection | 4/5/2017 | 4/12/2017 | 4/13/2017 2:28:31 PM | A | PASS |
|
|
WIP on foundation. Concrete washout is in use. Perimeter controls are maintained. No uncontained trash in subdivision project ok. No corrections requested.
|
ESC16-00914
| Tracking Control | 4/5/2017 | 4/12/2017 | 4/13/2017 11:20:42 AM | A | PASS |
|
|
Construction entrance on grand forest is in good conditions. Ensure this entrance/exit is being used not the entrance into the parking lot off Quamash way. Small amount of trackout still in parking lot.
|
ESC16-00264
| Aging Inspection | 4/12/2017 | 4/12/2017 | 4/12/2017 3:23:38 PM | | PASS |
|
|
Landscaping not installed yet.
|
ESC16-00429
| Site Final | 4/12/2017 | 4/12/2017 | 4/12/2017 3:08:45 PM | P | PASS |
|
|
|
ESC16-00429
| Aging Inspection | 4/12/2017 | 4/12/2017 | 4/12/2017 3:08:36 PM | | PASS |
|
|
Complete. Soil is stable no BMPs remaining. okay to final.
|
ESC14-01083
| General Inspection | 4/12/2017 | 4/12/2017 | 4/12/2017 2:59:30 PM | | CANC |
|
|
|
ESC16-00489
| General Inspection | 4/12/2017 | 4/12/2017 | 4/12/2017 2:59:10 PM | | PASS |
|
|
WIP on SFH. DIs ok.
|
ESC16-00625
| General Inspection | 4/12/2017 | 4/12/2017 | 4/12/2017 2:10:10 PM | | PASS |
|
|
WIP. No ESC violations observed.
|
ESC16-00705
| Site Final | 4/12/2017 | 4/12/2017 | 4/12/2017 1:42:35 PM | P | PASS |
|
|
|
ESC16-00705
| Site Final | 4/12/2017 | 4/12/2017 | 4/12/2017 1:42:25 PM | P | PASS |
|
|
|
ESC16-00705
| Aging Inspection | 4/12/2017 | 4/12/2017 | 4/12/2017 1:42:15 PM | | PASS |
|
|
Soil is stable. No temporary BMPs to remove. Okay to final.
|
ESC16-01100
| General Inspection | 4/12/2017 | 4/12/2017 | 4/12/2017 1:05:16 PM | | PASS |
|
|
No ESC issues
|
ESC16-01114
| Site Final | 4/12/2017 | 4/12/2017 | 4/12/2017 12:28:24 PM | P | PASS |
|
|
|
ESC16-01114
| General Inspection | 4/12/2017 | 4/12/2017 | 4/12/2017 12:28:02 PM | | PASS |
|
|
Project complete. No lose soil. Okay to final.
|
ESC16-00986
| Aging Inspection | 4/12/2017 | 4/12/2017 | 4/12/2017 12:10:41 PM | | PASS |
|
|
Landscaping not complete. Some windblown trash. Correction requested pick up trash.
|
ESC16-00659
| General Inspection | 4/12/2017 | 4/12/2017 | 4/12/2017 9:52:40 AM | P | PASS |
|
|
Almost complete. Landscaping has not been installed yet.
|
ESC16-01056
| General Inspection | 4/12/2017 | 4/12/2017 | 4/12/2017 9:46:21 AM | | PASS |
|
|
Almost complete. Landscaping has not been installed yet.
|
ESC17-00326
| Site Preparation | 4/11/2017 | 4/12/2017 | 4/12/2017 9:10:53 AM | A | PASS |
|
|
Bryan Phone #: ###-#### Sign is posted. Concrete washout pit has been dug RP will line with plastic. Reminded RP to watch for trackout and to contain windblown trash.
|
ESC17-00235
| Site Preparation | 4/11/2017 | 4/12/2017 | 4/12/2017 9:07:52 AM | A | PASS |
|
|
Rollo Phone #: ###-#### BMPs are installed per plan. Gave RP signs to post at sites. Okay to start.
|
ESC17-00105
| Site Preparation | 4/11/2017 | 4/12/2017 | 4/12/2017 9:07:12 AM | A | PASS |
|
|
John Phone #: ###-#### Project has already started. Called RP and reminded him to call in site preps before work begins. Concrete washout on site, sign is posted. Ensure trash containment is installed. Reminded RP to prevent windblown trash and trackout. Okay to start.
|