Inspections for the day of: Thursday, April 13, 2017.
Number of inspections: 22
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMelissa Jannusch
TitleEROSION INSPECTOR
Phone #789-3996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-01076 General Inspection4/13/20174/13/20174/13/2017 4:23:32 PM PASS
WIP on excavation. Foundation is poured for SFH. Area surrounded by dirt road. No trackout onto Healey. Sign is posted. Project ok.
ESC13-01279 General Inspection4/13/20174/13/20174/13/2017 4:21:16 PM PASS
WIP on townhomes. Trackout has been cleaned. No new trackout. No windblown trash. Project ok
ESC16-00524 Site Final4/13/20174/13/20174/13/2017 4:20:44 PMPPASS
ESC16-00524 Aging Inspection4/13/20174/13/20174/13/2017 4:20:34 PM PASS
Parking lot is finished. No temporary DI remaining. okay to final.
ESC15-01175 General Inspection4/13/20174/13/20174/13/2017 4:19:14 PM PASS
Interior and exterior WIP. No sediment is leaving job site. Project ok.
ESC12-00403 General Inspection4/13/20174/13/20174/13/2017 4:18:35 PM PASS
11th and Myrtle staging area still in use. Other areas of soil are stable and landscaped. No ESC issues observed in staging area.
ESC16-00935 General Inspection4/13/20174/13/20174/13/2017 3:08:38 PMPPEND
Excavator in use. Fence still not complete.
ESC15-00541 General Inspection4/13/20174/13/20174/13/2017 2:26:49 PMPPASS
WIP on SFHs. Perimeter controls are in place and working well. Trackout is controlled. No corrections.
ESC13-00524 General Inspection4/13/20174/13/20174/13/2017 2:25:25 PMPPASS
Vegetation on hillsides is growing well. No corrections.
ESC16-01431 General Inspection4/13/20174/13/20174/13/2017 2:19:34 PMPPASS
WIP on excavation. SWPPP available. No SWPPP inspections have been logged. Construction entrance is in good condition. Silt fence is in good condition. No trackout onto bogus basin rd.
Correction requested: log inspections in SWPPP binder. Talked with RP and clarified inspection frequencies with him.
ESC15-00403 Site Final4/13/20174/13/20174/13/2017 1:08:45 PMPPASS
ESC15-00403 General Inspection4/13/20174/13/20174/13/2017 1:08:20 PM PASS
Dirt pile and trash in parking lot have been cleaned okay to final
ESC16-01143 General Inspection4/13/20174/13/20174/13/2017 10:21:57 AM PASS
WIP. house nearly complete. Project ok. No ESC issues observed.
ESC16-01141 General Inspection4/13/20174/13/20174/13/2017 10:21:46 AM PASS
WIP. house nearly complete. Project ok. No ESC issues observed.
ESC16-01152 Site Final4/13/20174/13/20174/13/2017 10:21:33 AMPPASS
WIP. house nearly complete. Project ok. No ESC issues observed.
ESC16-01271 Site Final4/13/20174/13/20174/13/2017 10:19:58 AMPPASS
Landscaping complete
ESC16-01154 Site Final4/13/20174/13/20174/13/2017 10:19:40 AMPPASS
Landscaping complete
ESC16-01153 Site Final4/13/20174/13/20174/13/2017 10:19:18 AMPPASS
Landscaping complete
ESC16-01151 Site Final4/13/20174/13/20174/13/2017 10:18:58 AMPPASS
Landscaping complete
ESC16-01239 Site Final4/13/20174/13/20174/13/2017 10:18:41 AMPNR
Landscaping not complete
ESC17-00013 Site Preparation4/11/20174/13/20174/13/2017 9:33:16 AMANR
Preconstruction meeting. Plan to start construction in two weeks. Reminded participants to ensure BMPs were installed prior to start of project.
ESC16-01078 Aging Inspection4/13/20174/13/20174/13/2017 9:18:35 AM PASS
Not ready to final. Landscaping not complete. Silt fence still up.