ESC17-00018
| General Inspection | 4/7/2017 | 4/19/2017 | 4/20/2017 4:52:47 PM | A | PASS |
|
|
WIP. Pond is very full. Silt fence ok. No corrections.
|
ESC16-00605
| Aging Inspection | 4/19/2017 | 4/19/2017 | 4/20/2017 12:24:48 PM | | PASS |
|
|
House is complete. Landscaping has not been installed yet.
|
ESC17-00029
| General Inspection | 4/19/2017 | 4/19/2017 | 4/19/2017 4:42:47 PM | P | PASS |
|
|
Concrete washout installed. DI bag installed and ok.
|
ESC16-00719
| Aging Inspection | 4/19/2017 | 4/19/2017 | 4/19/2017 4:39:46 PM | | PASS |
|
|
No issues observed.
|
ESC16-01189
| General Inspection | 4/19/2017 | 4/19/2017 | 4/19/2017 4:38:54 PM | | CANC |
|
|
|
ESC16-00430
| General Inspection | 4/19/2017 | 4/19/2017 | 4/19/2017 4:38:45 PM | | PASS |
|
|
No ESC issues observed.
|
MIS17-00120
| ESC-Conference | 4/18/2017 | 4/19/2017 | 4/19/2017 4:37:16 PM | A | FAIL |
|
|
No one on site. Work is not permited for ESC or BLD. Site slopes towards the canal and needs perimeter control between the canal and the site to prevent runoff into the water. Issued a stop work order. Posted the stop work order sign in two visible places.
|
ESC17-00328
| Site Preparation | 4/18/2017 | 4/19/2017 | 4/19/2017 4:34:01 PM | P | PASS |
|
|
Met RP on site. Went over ESC expectations. Sign is posted. Okay to start. Andy Phone #: ###-####
|
ESC17-00295
| Tracking Control | 4/19/2017 | 4/19/2017 | 4/19/2017 4:32:40 PM | P | PEND |
|
|
Abram street has significant trackout along excavated area. Hand sweeping occurring at time of inspection. Check back to make sure trackout has been satisfactorily cleaned up.
|
ESC16-01489
| Complaint Inspection | 4/19/2017 | 4/19/2017 | 4/19/2017 1:40:57 PM | P | FAIL |
|
|
Trackout down Saxton Ave. No sign is posted. Talked with RP on phone. Corrections requested clean up trackout. Used rocked entrance to enter and exit site. Post sign. Follow up scheduled for next week.
|
ESC15-01224
| General Inspection | 4/19/2017 | 4/19/2017 | 4/19/2017 12:46:51 PM | | PASS |
|
|
Landscaping occuring at time of inspection.
|
ESC15-00556
| Tracking Control | 4/14/2017 | 4/19/2017 | 4/19/2017 12:45:47 PM | A | PASS |
|
|
Still some trackout but appears to have been swept. The sidewalks are cleaner. Continue to monitor trackout and encourage subs to sweep daily.
|
ESC16-00935
| General Inspection | 4/13/2017 | 4/19/2017 | 4/19/2017 12:44:05 PM | A | PEND |
|
|
Fence is still not installed. No other issues.
|
ESC16-00242
| General Inspection | 3/16/2017 | 4/19/2017 | 4/19/2017 12:42:32 PM | A | PASS |
|
|
Inspected stormwater pond for sediment plumes. Stormwater pond is not discharging into five mile creek therefore no turbidity testing is required. Inspected the rock check dams preventing flow into the adjacent parking lots. One needs maintenance which is logged in the SWPPP inspection report. Inspected DI bags around site to check for clogging. The DI bags have been recently replaced. A new rip rap drainage swale has been installed to collect and slow water entering the natural drainage area to the south of the site. This area has been tracked incorrectly and will need to be retracked/smoothed and potentially revegetated. Controls along the drainage area are in place to slow water and prevent sediment from entering the vegetation and potentially reaching five mile creek during an extreme event. Continue preforming maintenance noted in the inspections notes from the weekly inspections. ESC permit fee still need to be paid. E-mailed RP asking for update in payment status or reason for the delay. No outstanding corrections.
|