Inspections for the day of: Thursday, April 20, 2017.
Number of inspections: 22
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMelissa Jannusch
TitleEROSION INSPECTOR
Phone #789-3996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC14-01063 General Inspection4/20/20174/20/20174/28/2017 8:29:34 AM CANC
ESC15-00857 General Inspection4/20/20174/20/20174/28/2017 8:29:24 AM CANC
ESC16-00770 General Inspection4/20/20174/20/20174/25/2017 1:19:09 PM PASS
WIP on interior and exterior. Soil is not stable. Silt fence needs minor repairs.
ESC17-00127 Site Final4/14/20174/20/20174/21/2017 10:57:24 AMPPASS
Not ready for a site final. WIP on foundation. Sign is posted. No trackout. No trash arounds site. Project ok. No corrections requested.
ESC16-00159 General Inspection4/20/20174/20/20174/20/2017 4:47:48 PM PASS
WIP on SFH. No excessive trackout. DIs are ok.
ESC16-00841 General Inspection4/20/20174/20/20174/20/2017 4:47:24 PM PASS
No significant trackout. No other corrections
ESC15-00762 General Inspection4/20/20174/20/20174/20/2017 4:23:02 PM CANC
ESC17-00013 Site Preparation4/20/20174/20/20174/20/2017 4:22:13 PMPNR
Need to post sign and SWPPP board and have SWPPP on site.
ESC17-00373 Site Preparation4/20/20174/20/20174/20/2017 12:25:45 PMPPASS

Perimeter wattle is installed and sign is posted. Okay to continue.



Brad ###-####
ESC17-00373 Site Final4/19/20174/20/20174/20/2017 12:25:10 PMACANC
ESC17-00161 General Inspection4/12/20174/20/20174/20/2017 12:24:15 PMAPASS
30th Foundation poured. Soil is contained onsite. Project ok.
ESC16-00978 Aging Inspection4/20/20174/20/20174/20/2017 12:23:44 PM PASS
Signs are posted. WIP on interior and exterior. No dirt entering roadway.
ESC16-01213 General Inspection4/20/20174/20/20174/20/2017 12:23:02 PM FAIL
Fix construction entrance. Gravel parking area for workers. Clean up trackout. Talked with RP requesting corrections. Follow up scheduled for Tuesday.
ESC17-00360 Site Preparation4/19/20174/20/20174/20/2017 11:25:02 AMAPASS
Met with RP on site. Sign is posted. Went over ESC requirements. RP plans to install concrete washout and wattle along perimeter.

Call 30 minutes before // Michael Phone #: ###-####
ESC03-00514 DOC - Permit Finaled4/20/20174/20/20174/20/2017 7:58:16 AMPPASS
Project complete. Permit from 2003. okay to final
ESC03-00517 DOC - Permit Finaled4/20/20174/20/20174/20/2017 7:57:55 AMPPASS
Project complete. Permit from 2003. okay to final
ESC03-00518 DOC - Permit Finaled4/20/20174/20/20174/20/2017 7:57:30 AMPPASS
Project complete. Permit from 2003. okay to final
ESC03-00507 DOC - Permit Finaled4/20/20174/20/20174/20/2017 7:56:29 AMPPASS
Project complete. Permit from 2003. okay to final
ESC03-00594 DOC - Permit Finaled4/20/20174/20/20174/20/2017 7:53:07 AMPPASS
Project complete. Permit from 2003. okay to final
ESC03-00597 DOC - Permit Finaled4/20/20174/20/20174/20/2017 7:52:20 AMPPASS
Project complete. Permit from 2003. okay to final
ESC03-00598 DOC - Permit Finaled4/20/20174/20/20174/20/2017 7:51:46 AMPPASS
Project complete. Permit from 2003. okay to final
ESC03-00599 DOC - Permit Finaled4/20/20174/20/20174/20/2017 7:48:19 AMPPASS
Project complete. Permit from 2003. okay to final