Inspections for the day of: Monday, April 24, 2017.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMelissa Jannusch
TitleEROSION INSPECTOR
Phone #789-3996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-00142 General Inspection4/24/20174/24/20174/25/2017 2:29:36 PM PASS
Project is complete. Soil is stable. Temporary BMPs are removed. Okay to final.
ESC16-00319 General Inspection4/24/20174/24/20174/25/2017 1:50:34 PM PASS
revegetation in progress. Silt fence needs to be removed before site final can be passed.
ESC15-01322 Aging Inspection4/24/20174/24/20174/25/2017 12:36:28 PM PASS
Staging area is clean. Trash is contained. No ESC issues observed.
ESC15-01004 General Inspection4/24/20174/24/20174/25/2017 12:35:23 PM PEND
WIP on the roads and utilities. Ensure sediment on the road is cleaned when utility trenching is complete.
ESC16-00137 Aging Inspection4/24/20174/24/20174/24/2017 2:32:17 PM PASS
WIP on interior. Some exposed soil. No ESC issues occurring.
ESC13-00806 General Inspection4/24/20174/24/20174/24/2017 1:58:54 PM PASS
No ESC issues. No progress on front yard vegetation.
ESC15-00234 Aging Inspection4/24/20174/24/20174/24/2017 1:57:52 PM PEND
Remove termporary BMPs.
ESC11-00879 General Inspection4/24/20174/24/20174/24/2017 1:40:33 PM PASS
WIP on SFHs. subdivision controls are ok.
ESC15-01543 General Inspection4/24/20174/24/20174/24/2017 1:38:54 PM PASS
Vertical WIP. Perimeter controls in good condition. Trash is contained. No trackout. No corrections.
ESC17-00471 Site Preparation4/21/20174/24/20174/24/2017 12:52:19 PMAPART
Met with RP and discussed what BMPs would work for the site. Sign is posted.

ESC17-00204 Site Preparation4/21/20174/24/20174/24/2017 12:50:55 PMAPASS
Trackout is better. Sign is posted. Okay to start.
Clint Phone #: ###-####
ESC17-00237 Site Preparation4/21/20174/24/20174/24/2017 12:50:02 PMAPASS
Okay to start. Met RP on site and went over ESC expectations. DI protection should be maintenance after the rain event.
Josh Phone #: ###-####
ESC16-00189 General Inspection4/24/20174/24/20174/24/2017 10:29:43 AM PASS
Verticle WIP. No trackout. Project ok.
ESC16-00241 Aging Inspection4/24/20174/24/20174/24/2017 10:21:53 AM PASS
No ESC issues observed.
ESC03-00580 DOC - Permit Finaled4/24/20174/24/20174/24/2017 8:56:07 AMPPASS
Project complete. Permit from 2003. Okay to final.