ESC16-00499
| General Inspection | 4/6/2017 | 4/6/2017 | 4/7/2017 3:06:16 PM | | PASS |
|
|
Retaining wall has been built along sidewalk. This should prevent soil from leaving the site. WIP on the basement. No trackout onto street.
|
ESC16-00406
| General Inspection | 4/4/2017 | 4/6/2017 | 4/7/2017 3:05:05 PM | P | FAIL |
|
|
No sweeping has occurred. Maintenance has not been performed on construction entrance. Tracking control inspection scheduled for next week.
|
ESC16-01534
| Site Preparation | 4/6/2017 | 4/6/2017 | 4/7/2017 9:25:01 AM | P | PASS |
|
|
Okay to start. Concrete washout maintenance has been performed. Subdivision still has trackout. Clint Phone #: ###-####
|
ESC16-01649
| Site Preparation | 4/6/2017 | 4/6/2017 | 4/7/2017 9:24:47 AM | P | PASS |
|
|
Okay to start. Concrete washout maintenance has been performed. Subdivision still has trackout.
Clint Phone #: ###-####
|
ESC15-01483
| General Inspection | 4/6/2017 | 4/6/2017 | 4/6/2017 10:34:03 AM | | PASS |
|
|
Nearing completion. No significant trackout. Project ok.
|
ESC16-00941
| General Inspection | 4/6/2017 | 4/6/2017 | 4/6/2017 10:19:03 AM | | CANC |
|
|
|
ESC16-00353
| General Inspection | 4/6/2017 | 4/6/2017 | 4/6/2017 10:17:21 AM | | PASS |
|
|
Project inactive. BMPs oks. No corrections
|
ESC15-01210
| General Inspection | 4/6/2017 | 4/6/2017 | 4/6/2017 10:01:52 AM | | PASS |
|
|
Subdivision swept earlier this week. BMPs ok. Maintenance up to date.
|
ESC17-00241
| General Inspection | 4/4/2017 | 4/6/2017 | 4/6/2017 9:59:20 AM | P | PASS |
|
|
Project underway. No ESC issues observed.
|
ESC16-00945
| General Inspection | 4/6/2017 | 4/6/2017 | 4/6/2017 9:38:19 AM | | PASS |
|
|
WIP on sidewalks. Construction entrance ok. No trackout. No corrections
|
ESC16-00938
| General Inspection | 4/6/2017 | 4/6/2017 | 4/6/2017 9:34:30 AM | | PASS |
|
|
Perimeter controls ok. No trackout or runoff. Revegetation phase.
|
ESC17-00078
| General Inspection | 4/6/2017 | 4/6/2017 | 4/6/2017 9:33:43 AM | P | PASS |
|
|
Contaminated soil removal complete. Grading underway. Project ok.
|
ESC16-00989
| General Inspection | 3/31/2017 | 4/6/2017 | 4/5/2017 1:04:45 PM | P | FAIL |
|
|
Second fail. DI bags have not been changed. Trackout has not been cleaned. Spoke with RP. Plans to preform corrections today. Follow up scheduled.
|