ESC17-00300
| Site Preparation | 5/19/2017 | 5/19/2017 | 5/19/2017 3:40:38 PM | P | PASS |
|
|
Sign posted. New concrete washout installed. some trackout from new washout area. Okay to start.
Clint Phone #: ###-####
|
ESC16-01135
| Site Final | 5/19/2017 | 5/19/2017 | 5/19/2017 2:23:39 PM | P | PASS |
|
|
|
ESC16-01135
| Aging Inspection | 5/19/2017 | 5/19/2017 | 5/19/2017 2:23:30 PM | | PASS |
|
|
Landscaping is complete. No ESC violations. Okay to final
|
ESC16-01297
| General Inspection | 5/19/2017 | 5/19/2017 | 5/19/2017 2:22:37 PM | P | PASS |
|
|
Landscaping not complete. Once landscaping is installed and trash is picked up okay to final.
|
ESC16-01398
| General Inspection | 5/19/2017 | 5/19/2017 | 5/19/2017 2:22:27 PM | P | PASS |
|
|
Landscaping not complete. Once landscaping is installed and trash is picked up okay to final.
|
ESC15-01391
| General Inspection | 5/19/2017 | 5/19/2017 | 5/19/2017 10:42:45 AM | | CANC |
|
|
|
ESC16-01608
| Tracking Control | 5/17/2017 | 5/19/2017 | 5/19/2017 10:42:33 AM | A | FAIL |
|
|
Trackout not cleaned. No concrete washout installed.
|
ESC17-00456
| Site Preparation | 5/18/2017 | 5/19/2017 | 5/19/2017 10:32:36 AM | A | PASS |
|
|
Met with contractor onsite. Sign is posted. Wattle place along back of site perimeter to protect the intermittent creek. Went over ESC requirements with contractor. Correction requested: DI bags need to be changed and gutter needs to be swept up. Follow up inspection scheduled to check for compliance.
Brad Phone #: ###-####
|
ESC15-01579
| General Inspection | 5/19/2017 | 5/19/2017 | 5/19/2017 10:08:35 AM | P | PART |
|
|
Silt fence has still not been repaired. No sediment moving offsite. No trackout. Water is rising.
|
ESC16-01561
| General Inspection | 5/19/2017 | 5/19/2017 | 5/19/2017 10:08:04 AM | P | PASS |
|
|
Water from walling creek is flooding marine Williams park parking lot and flowing into the road. Water is entering the DI on the south side of the road by the completed town homes. Called RP and told him to remove DI bags on N side of the road if water begins flowing over the meridian.
|
ESC16-00436
| General Inspection | 5/19/2017 | 5/19/2017 | 5/19/2017 10:05:22 AM | P | PART |
|
|
Silt fence has still not been repaired. No sediment moving offsite. No trackout. Water is rising.
|
ESC16-00437
| General Inspection | 5/19/2017 | 5/19/2017 | 5/19/2017 10:04:59 AM | P | PART |
|
|
Silt fence has still not been repaired. No sediment moving offsite. No trackout. Water is rising.
|
ESC16-00435
| General Inspection | 5/19/2017 | 5/19/2017 | 5/19/2017 10:04:44 AM | P | PART |
|
|
Silt fence has still not been repaired. No sediment moving offsite. No trackout. Water is rising.
|
ESC15-01224
| Site Final | 5/19/2017 | 5/19/2017 | 5/19/2017 9:23:50 AM | P | PASS |
|
|
|
ESC15-01224
| General Inspection | 5/19/2017 | 5/19/2017 | 5/19/2017 9:23:30 AM | | PASS |
|
|
Landscaping complete. All soil is stabilized. No temporary DI protection drainage into curb cuts and pavers. Pavement and sidewalks are swept and free of sediment. All temporary BMPS have been removed.
|