PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Monday, May 22, 2017
.
Number of inspections:
21
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Melissa Jannusch
Title
EROSION INSPECTOR
Phone #
789-3996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC17-00018
General Inspection
5/22/2017
5/22/2017
5/24/2017 11:11:32 AM
P
PASS
Called RP Cody to request dust control. Eckert road is now paved. Water is still flowing through drainage ditch across Eckert road into wetland by the river.
ESC16-00941
General Inspection
5/22/2017
5/22/2017
5/22/2017 4:30:54 PM
PASS
No trackout. Trash contained. SWPPP not available on site. Perimeter controls are ok. Talked with onsite representative about making sure SWPPP was on site and that regular inspection were occurring. No corrections.
ESC16-01617
General Inspection
5/22/2017
5/22/2017
5/22/2017 4:06:13 PM
A
PASS
WIP on excavation. Entrance is working to prevent trackout. Perimeter BMPs are in good conditions. No corrections.
ESC15-00762
General Inspection
5/22/2017
5/22/2017
5/22/2017 12:45:25 PM
PASS
ESC16-00363
Aging Inspection
5/22/2017
5/22/2017
5/22/2017 12:36:20 PM
PASS
Parts of driveway have been removed. building is still standing. No ESC issues
ESC15-00729
General Inspection
5/22/2017
5/22/2017
5/22/2017 11:41:11 AM
P
PEND
WIP on SFHs. No new issues since the last inspection. Drainage channel on access road is still severely eroded. Drainage channel will need to be repaired before hillside bond can be released.
ESC17-00533
General Inspection
5/22/2017
5/22/2017
5/22/2017 11:02:32 AM
P
PASS
ESC17-00235
General Inspection
5/22/2017
5/22/2017
5/22/2017 11:02:21 AM
P
PASS
ESC17-00271
General Inspection
5/22/2017
5/22/2017
5/22/2017 11:02:10 AM
P
PASS
ESC17-00197
General Inspection
5/22/2017
5/22/2017
5/22/2017 11:01:57 AM
P
FAIL
Needs sweeping and trash pick up. left message for RP with corrections. Follow up next week.
ESC17-00104
General Inspection
5/22/2017
5/22/2017
5/22/2017 10:55:44 AM
P
PASS
WIP on excavation. Wattles is in good condition. No trackout.
ESC17-00154
General Inspection
5/22/2017
5/22/2017
5/22/2017 10:54:03 AM
P
PART
Stockpile on sidewalk. Should move stockpile back behind wattles. WIP on foundations. Silt fence ok.
ESC17-00256
General Inspection
5/22/2017
5/22/2017
5/22/2017 10:52:13 AM
P
PASS
Some trackout. Silt fence ok. WIP on foundation. Concrete washout is being used.
ESC16-01197
Site Final
5/22/2017
5/22/2017
5/22/2017 10:49:12 AM
P
PASS
ESC16-01197
General Inspection
5/22/2017
5/22/2017
5/22/2017 10:49:00 AM
P
CANC
ESC16-01197
General Inspection
5/22/2017
5/22/2017
5/22/2017 10:48:46 AM
PASS
Landscaping complete. No trash or temporary BMPs remaining. Okay to final.
ESC16-01253
General Inspection
5/22/2017
5/22/2017
5/22/2017 10:12:30 AM
P
PASS
Verticle WIP. No other ESC issues.
ESC16-00841
General Inspection
5/22/2017
5/22/2017
5/22/2017 10:11:43 AM
PASS
DI bag is clogged. Verticle WIP. No landscaping.
ESC16-01743
General Inspection
5/22/2017
5/22/2017
5/22/2017 9:55:41 AM
P
FAIL
Run off issues causing sediment to deposit on sidewalk. Silt fence is channeling runoff causing the problem. Left message with RP suggesting the addition of a wattle or other BMP to stop flow onto sidewalk. Correction request for RP to clean sediment of sidewalk follow up for next week.
ESC15-00556
General Inspection
5/19/2017
5/22/2017
5/22/2017 9:31:16 AM
A
PART
Tao Boven need to change DI bags. Sweeping needed. Other DI bags need to be changed soon.
ESC15-01288
General Inspection
5/22/2017
5/22/2017
5/22/2017 9:29:29 AM
PASS
WIP on staking down the ECB in the drainage channel. Subdivision has been recently swept. New DI bags are needed.