Inspections for the day of: Monday, June 12, 2017.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMelissa Jannusch
TitleEROSION INSPECTOR
Phone #789-3996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-00741 General Inspection6/12/20176/12/20176/12/2017 4:52:00 PM PASS
ESC16-00843 Site Final6/12/20176/12/20176/12/2017 4:51:48 PMPNR
Not ready to final.
Main building area soil is stable and no remaining temporary BMPs.

Sediment pond is not landscaped yet.

Stagging area on lot across street is going to be used for a future project.

Let RP know that ESC final will wait until after revegetation takes place but will not effect the certificate of ocupancy.
Brent ###-####
ESC15-01184 General Inspection6/12/20176/12/20176/12/2017 11:56:56 AM PASS
WIP on interior and exterior. Entrance is in good condition. No trackout or windblown trash. Okay.
ESC15-00863 Aging Inspection6/12/20176/12/20176/12/2017 11:35:48 AM PASS
No WIP. No ESC issues.
ESC16-00963 General Inspection6/12/20176/12/20176/12/2017 10:50:49 AM PASS
WIP on landscpaing and exterior.
ESC16-01246 General Inspection6/9/20176/12/20176/12/2017 10:39:08 AMAPASS
Need to remove DI bag for final.
ESC16-00953 General Inspection6/12/20176/12/20176/12/2017 10:33:18 AM PASS
WIP on interior and exterior and landscaping.
ESC16-00329 General Inspection6/12/20176/12/20176/12/2017 10:14:36 AM PASS
WIP no ESC issue observed.
ESC16-00225 General Inspection6/12/20176/12/20176/12/2017 10:05:05 AMAPASS
Stormwater basin. Wattles have been removed. Some of the banks have been re-graded and re-tracked. The bottom has been re-graded and re-tracked. There is still a rill on the North bank.
Revegetation occurring on the rest of the site. Some rills remaining on East slopes of the site.
ESC16-00603 General Inspection6/12/20176/12/20176/12/2017 9:33:31 AM PASS
Revegetation in phase. No corrections.
ESC17-00055 Tracking Control6/12/20176/12/20176/12/2017 9:22:57 AMPFAIL
Trackout please sweep. Follow up Wednesday. Message sent to RP with correction request.
ESC16-00438 Aging Inspection6/12/20176/12/20176/12/2017 8:15:47 AM CANC
ESC16-00975 General Inspection6/12/20176/12/20176/12/2017 8:13:00 AM CANC