Inspections for the day of: Tuesday, June 13, 2017.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMelissa Jannusch
TitleEROSION INSPECTOR
Phone #789-3996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-01431 General Inspection6/13/20176/13/20176/19/2017 4:17:49 PMPCANC
ESC16-00489 General Inspection6/13/20176/13/20176/16/2017 8:24:45 AM CANC
ESC16-01100 General Inspection6/13/20176/13/20176/16/2017 8:24:38 AM CANC
ESC16-00159 BMP Violation6/8/20176/13/20176/16/2017 8:24:23 AMACANC
ESC16-01143 BMP Violation6/8/20176/13/20176/16/2017 8:24:12 AMACANC
ESC17-00363 Site Preparation6/13/20176/13/20176/14/2017 7:56:13 AMPPASS
Okay to start

Jason Phone #: ###-####
ESC16-01741 Site Preparation6/13/20176/13/20176/14/2017 7:56:01 AMPPASS
Okay to start

Jason Phone #: ###-####
ESC17-00362 Site Preparation6/13/20176/13/20176/14/2017 7:55:44 AMPPASS
Okay to start.

Jason Phone #: ###-####
ESC14-00788 General Inspection6/13/20176/13/20176/13/2017 11:36:02 AMPPASS
Drainage system okay after rain event.
ESC16-01078 Site Final6/13/20176/13/20176/13/2017 11:35:38 AMPPASS
ESC16-01078 Aging Inspection6/13/20176/13/20176/13/2017 11:35:29 AM PASS
Landscaping complete. Okay to final.
ESC14-00788 General Inspection6/13/20176/13/20176/13/2017 11:09:19 AMPCANC
ESC15-00729 General Inspection6/13/20176/13/20176/13/2017 10:42:16 AMPPEND
Lower drainage channel: WIP on lower drainage channel where check dams were previously located. Lower drainage channel piping and outlets are being re done.

Drainage channel on access road: The temporary measures to divert water back into the drainage channel have been unsuccessful. The run off from the rain event last night is draining out of the piped outlet and the flowing to the outside of the rip rap channel causing erosion of the drainage channel. This channel will need redesign and repairs.

WIP on SFHs. Some slight trackout.

No slope failures or other problems from the rain event
ESC15-01288 General Inspection6/13/20176/13/20176/13/2017 9:57:17 AMPPEND
Concrete washout has been replaced. The washout is still located on a slope. RP needs to ensure the concrete washout does not overflow again.

Some small amounts of trackout in subdivision but most areas have been swept up.

Several lots have filled with water from the rain event yesterday evening and night. Some lots are draining water into the stormwater system.

Some grass areas that was laid over the ECBs are turning brown. No other issues with the drainage channel after the rain event.
ESC15-00556 General Inspection6/13/20176/13/20176/13/2017 9:35:33 AMPPASS
Sweeping occuring at time of inspection. WIP on SFH. No corrections requested.
ESC16-01650 General Inspection6/13/20176/13/20176/13/2017 9:19:45 AMPPASS
Sign is posted. No trackout. BMPs are installed. No windblow trash. WIP on excavation.