PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Friday, June 16, 2017
.
Number of inspections:
29
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Melissa Jannusch
Title
EROSION INSPECTOR
Phone #
789-3996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC16-01476
Complaint Inspection
6/16/2017
6/16/2017
6/21/2017 8:39:12 AM
P
PASS
Trash contained, no trackout, signs are posted. Concrete slurry in dirt alleyway. Slurry not in danger of running off into a storm drain. Alley is to be paved soon as well. Area is flat large field behind project. No corrections issued at the time of inspection.
ESC16-01167
General Inspection
6/16/2017
6/16/2017
6/19/2017 12:48:12 PM
PASS
WIP on Jefferson st re paving. No ESC issues observed.
ESC15-01210
General Inspection
6/16/2017
6/16/2017
6/19/2017 12:42:02 PM
PASS
WIP on SFHs. No trackout. Trash contained. Subdivision BMPs okay.
ESC17-00270
General Inspection
6/15/2017
6/16/2017
6/19/2017 8:41:27 AM
A
CANC
follow up inspection; check wattles
ESC16-01301
Aging Inspection
6/16/2017
6/16/2017
6/16/2017 4:34:22 PM
CANC
ESC16-01141
General Inspection
6/16/2017
6/16/2017
6/16/2017 4:34:07 PM
PASS
ESC16-01340
Site Final
6/16/2017
6/16/2017
6/16/2017 4:32:28 PM
P
PASS
ESC16-01344
Site Final
6/16/2017
6/16/2017
6/16/2017 4:30:51 PM
P
PASS
ESC16-01344
Aging Inspection
6/16/2017
6/16/2017
6/16/2017 4:30:37 PM
PASS
ESC16-01047
Site Final
6/16/2017
6/16/2017
6/16/2017 4:29:41 PM
P
PASS
ESC16-00853
General Inspection
6/16/2017
6/16/2017
6/16/2017 4:27:42 PM
PEND
Trackout onto Echo court. Called RP for Lasher construction Brian Murdoch and requested that he get a standalone ESC staging permit for 3309
Echo ct. since this site has had multiple trackout infractions caused by both Lasher construction and Sunrise construction who is currently building next door. This will ensure corrective actions are written for the correct site, company, and RP. I told the RP that the fee for this ESC staging permit can be applied toward the future ESC permit that will be attached to the building permit for the SFH that will be built on this site.
Called RP for adjacent lot 3327 Echo and spoke with RP Justin Reynolds who takes responsibility for the current trackout violation and will be responsible for cleaning it. I told him that Lasher construction will be getting an ESC permit for the site and that he should disallow his contractors from entering his site through Lasher’s site. He has placed several cones with caution tape in attempt to keep workers out of the vacant site but they were recently moved.
Justin also says the excavator is the same for both companies which may be adding to the confusion for the subcontractors.
Having 3309 Echo court get an ESC permit should help ensure that corrective actions reach the right RP and keep Echo court free from trackout.
Actions to be taken:
3327 Echo ct. with RP Justin Reynold will clean trackout in Echo court. RP will tell staff to not enter the lot through the 3309 Echo ct. Follow up next week.
3309 Echo ct. with RP Bryan Murdoch will apply for ESC staging permit. The fee for this permit can be applied for a future ESC building permit on this site. Follow up on permit application next week.
MIS17-00196
ESC-Conference
6/16/2017
6/16/2017
6/16/2017 4:26:29 PM
P
PEND
Trackout onto Echo court. Called RP for Lasher construction Brian Murdoch and requested that he get a standalone ESC staging permit for 3309 Echo ct. since this site has had multiple trackout infractions caused by both Lasher construction and Sunrise construction who is currently building next door. This will ensure corrective actions are written for the correct site, company, and RP. I told the RP that the fee for this ESC staging permit can be applied toward the future ESC permit that will be attached to the building permit for the SFH that will be built on this site.
Called RP for adjacent lot 3327 Echo and spoke with RP Justin Reynolds who takes responsibility for the current trackout violation and will be responsible for cleaning it. I told him that Lasher construction will be getting an ESC permit for the site and that he should disallow his contractors from entering his site through Lasher’s site. He has placed several cones with caution tape in attempt to keep workers out of the vacant site but they were recently moved.
Justin also says the excavator is the same for both companies which may be adding to the confusion for the subcontractors.
Having 3309 Echo court get an ESC permit should help ensure that corrective actions reach the right RP and keep Echo court free from trackout.
Actions to be taken:
3327 Echo ct. with RP Justin Reynold will clean trackout in Echo court. RP will tell staff to not enter the lot through the 3309 Echo ct. Follow up next week.
3309 Echo ct. with RP Bryan Murdoch will apply for ESC staging permit. The fee for this permit can be applied for a future ESC building permit on this site. Follow up on permit application next week.
ESC16-01346
Site Final
6/16/2017
6/16/2017
6/16/2017 4:04:57 PM
P
PASS
ESC16-01346
Aging Inspection
6/16/2017
6/16/2017
6/16/2017 4:04:47 PM
PASS
Ok to final ESC permit
ESC17-00411
Site Preparation
6/16/2017
6/16/2017
6/16/2017 2:29:27 PM
P
PASS
Phone #: ###-#### Inspection requested via web by Braxton Hansen
ESC17-00478
Site Preparation
6/16/2017
6/16/2017
6/16/2017 2:29:14 PM
P
PASS
Phone #: ###-#### Inspection requested via web by Braxton Hansen
ESC17-00512
Site Preparation
6/16/2017
6/16/2017
6/16/2017 2:29:03 PM
P
PASS
Phone #: ###-#### Inspection requested via web by Braxton Hansen
ESC16-01348
Aging Inspection
6/16/2017
6/16/2017
6/16/2017 12:28:33 PM
CANC
ESC16-01582
General Inspection
6/14/2017
6/16/2017
6/16/2017 12:27:52 PM
A
CANC
ESC16-00948
General Inspection
6/14/2017
6/16/2017
6/16/2017 12:24:35 PM
A
PART
Some trackout on interior roads. DI bags okay. No concrete slurry visable on the ground or areas that can runoff the site.
ESC15-00853
General Inspection
6/15/2017
6/16/2017
6/16/2017 11:21:50 AM
A
PART
Dumpster is one site. Wattles are one site. DI bags are clean. Gutters are clean. Trackout still on interior road. Trackout onto Hill road.
Correction: clean trackout on interior and exterior road
RP has sweeper scheduled for Monday.
ESC16-01570
General Inspection
6/16/2017
6/16/2017
6/16/2017 10:11:08 AM
P
PASS
WIP on interior and exterior. No trackout, trash is contained. No ESC issues observed.
ESC16-00365
Site Final
6/14/2017
6/16/2017
6/16/2017 10:06:56 AM
P
PASS
Landscaped, no temp BMPs, no trash okay to final ESC.
ESC16-00159
BMP Violation
6/16/2017
6/16/2017
6/16/2017 10:02:19 AM
P
PEND
RP Clint Wall got a new phone so the correction requests were not reaching him. I have recieved RP Clint's new phone number and requested the corrections. He is starting work on corrections currently. Will follow up monday.
ESC17-00322
Site Preparation
6/15/2017
6/16/2017
6/16/2017 9:34:14 AM
A
PASS
Clint Phone #: ###-####
ESC16-01143
BMP Violation
6/16/2017
6/16/2017
6/16/2017 9:34:00 AM
P
PEND
RP Clint Wall got a new phone so the correction requests were not reaching him. I have recieved RP Clint's new phone number and requested the corrections. He is starting work on corrections currently. Will follow up monday.
ESC17-00388
Site Preparation
6/15/2017
6/16/2017
6/15/2017 1:46:42 PM
A
PASS
Erby Phone #: ###-####
ESC17-00429
Site Preparation
6/15/2017
6/16/2017
6/15/2017 1:46:32 PM
A
PASS
Erby Phone #: ###-####
ESC17-00430
Site Preparation
6/15/2017
6/16/2017
6/15/2017 1:46:23 PM
A
PASS