Inspections for the day of: Friday, June 2, 2017.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMelissa Jannusch
TitleEROSION INSPECTOR
Phone #789-3996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-01252 Site Final6/2/20176/2/20176/2/2017 3:51:11 PMPPASS
ESC16-01252 Aging Inspection6/2/20176/2/20176/2/2017 3:51:01 PM PASS
Home is complete and yard is landscaped. No temporary BMPs. Okay to final
ESC16-00676 General Inspection6/2/20176/2/20176/2/2017 3:50:38 PM PASS
Vertical work in progress. Some trackout. No other ESC issues.
Denton. Vertical WIP
Silt fence ok
Some minor trackout not leaving the interior of the site.
Trash is contained.
The dumpster is getting close to being full.
No corrections requested.
ESC16-01054 Aging Inspection6/2/20176/2/20176/2/2017 3:49:40 PM PASS
ESC17-00203 General Inspection5/31/20176/2/20176/2/2017 3:46:37 PMAPASS
Talked with Project manager Darrell. Has two water trucks and a sweeper ready when needed. Gave him information on PDS online.
ESC39-00001 Aging Inspection6/2/20176/2/20176/2/2017 3:36:42 PM CANC
ESC17-00625 General Inspection6/2/20176/2/20176/2/2017 12:20:54 PMPPASS
No WIP. Dewatering has not started yet.
ESC16-01231 Site Final6/2/20176/2/20176/2/2017 12:11:11 PMPPASS
ESC16-01115 General Inspection6/2/20176/2/20176/2/2017 11:51:57 AMPPASS
Demolition of existing house complete. New house has not been started. No ESC issues. Sign is posted.
ESC16-01260 Aging Inspection6/2/20176/2/20176/2/2017 11:31:42 AM CANC
ESC16-01113 General Inspection6/2/20176/2/20176/2/2017 11:31:25 AMPPASS
WIP. Some trackout on the private road. Trash is contained.
ESC17-00092 General Inspection6/2/20176/2/20176/2/2017 11:29:38 AMPPASS
WIP. Some trackout on the private road. Trash is contained.
ESC17-00111 General Inspection6/2/20176/2/20176/2/2017 11:15:29 AMPPASS
Dewatering is ongoing. The dewatering operation is set up to plan and appears somewhat effective. The check dam is nearly getting overtopped. If the check dam gets overtopped, make sure to add more washed rocked.
ESC15-01420 General Inspection6/2/20176/2/20176/2/2017 10:10:26 AM PASS
WIP on SFHs. Some stucco slurry on the ground. Trash is contained. No trackout. Some runoff from the natural area to the North but not due to the construction activities.
ESC14-01063 General Inspection6/2/20176/2/20176/2/2017 9:45:34 AM PASS
No immediate correction to address.

No WIP. Revegetation is taking place. Drainage channel coming down Arrowvilla that ends where the sidewalk begins has a highly eroded channel running through the middle of the channel. Dirt piles have been placed higher up in the channel in an attempt to slow the water. The combination of heavy duty wattles and hay bales are in place to contain the sediment run off and erosion from the channel. The hay bales and heavy duty wattles appear to be effective at keeping the sediment from entering the road and have a significant amount of sediment build up and will need to be cleaned out soon. The landslide has some revegetation occurring and does not appear to have increased in area.

There is WIP on SFHs on Goshawk. The concrete appears to have been emptied recently. No trackout. Trash is contained. DIs ok.