ESC13-01279
| General Inspection | 6/5/2017 | 6/5/2017 | 6/6/2017 4:48:50 PM | P | PART |
|
|
ECB have been staked down. No other ESC isues observed.
|
ESC14-00206
| General Inspection | 6/2/2017 | 6/5/2017 | 6/6/2017 4:26:08 PM | A | PEND |
|
|
Phase complete. Some DI bags still in place. Concrete washout needs to be cleaned up before this permit can be finaled.
|
ESC17-00197
| Tracking Control | 6/2/2017 | 6/5/2017 | 6/6/2017 3:36:24 PM | A | PASS |
|
|
WIP. Trash contained. some slight trackout. BMPs ok.
|
ESC16-00265
| Aging Inspection | 6/5/2017 | 6/5/2017 | 6/6/2017 1:26:10 PM | | PASS |
|
|
Landscaping complete okay to final.
|
ESC15-01579
| General Inspection | 6/5/2017 | 6/5/2017 | 6/6/2017 10:44:03 AM | | PART |
|
|
Fence needs repairs still Windblown trash in pond Continue sweeping Dumpster ok Site needs a trash pick up. Bottles, paint cans and other trash are littered around the site. Talked with project manager about corrections. Dewatering has not started yet. Project manager will call for an inspection when dewatering starts.
|
ESC16-00437
| General Inspection | 6/5/2017 | 6/5/2017 | 6/6/2017 10:44:03 AM | | PART |
|
|
Fence needs repairs still Windblown trash in pond Continue sweeping Dumpster ok Site needs a trash pick up. Bottles, paint cans and other trash are littered around the site. Talked with project manager about corrections. Dewatering has not started yet. Project manager will call for an inspection when dewatering starts.
|
ESC16-00436
| General Inspection | 6/5/2017 | 6/5/2017 | 6/6/2017 10:44:03 AM | | PART |
|
|
Fence needs repairs still Windblown trash in pond Continue sweeping Dumpster ok Site needs a trash pick up. Bottles, paint cans and other trash are littered around the site. Talked with project manager about corrections. Dewatering has not started yet. Project manager will call for an inspection when dewatering starts.
|
ESC16-00435
| General Inspection | 6/5/2017 | 6/5/2017 | 6/6/2017 10:44:03 AM | | PART |
|
|
Fence needs repairs still Windblown trash in pond Continue sweeping Dumpster ok Site needs a trash pick up. Bottles, paint cans and other trash are littered around the site. Talked with project manager about corrections. Dewatering has not started yet. Project manager will call for an inspection when dewatering starts.
|
ESC17-00610
| Site Preparation | 6/5/2017 | 6/5/2017 | 6/5/2017 4:26:00 PM | P | CANC |
|
|
Rescheduled.
|
ESC16-00435
| Site Preparation | 6/5/2017 | 6/5/2017 | 6/5/2017 3:50:54 PM | P | CANC |
|
|
|
ESC15-01391
| General Inspection | 6/5/2017 | 6/5/2017 | 6/5/2017 9:44:06 AM | | CANC |
|
|
|
ESC17-00246
| General Inspection | 5/26/2017 | 6/5/2017 | 6/5/2017 9:42:49 AM | A | PASS |
|
|
WIP. Vegetation is containing sediment. No trackout. Trash is contained. No corrections.
|
ESC15-01138
| General Inspection | 6/5/2017 | 6/5/2017 | 6/5/2017 9:29:06 AM | | PART |
|
|
WIP on foundation. Silt fence needs repairs. Concrete washout is being used. No trash or trackout.
|
ESC16-00224
| Site Final | 6/5/2017 | 6/5/2017 | 6/5/2017 9:00:32 AM | P | PASS |
|
|
|
ESC16-00224
| Aging Inspection | 6/5/2017 | 6/5/2017 | 6/5/2017 9:00:21 AM | | PASS |
|
|
Landscaping complete. Okay to final.
|
ESC16-00282
| Site Final | 6/5/2017 | 6/5/2017 | 6/5/2017 8:59:17 AM | P | PASS |
|
|
|
ESC16-00282
| Aging Inspection | 6/5/2017 | 6/5/2017 | 6/5/2017 8:59:02 AM | | PASS |
|
|
Landscaping complete. Okay to final.
|