Inspections for the day of: Friday, June 9, 2017.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMelissa Jannusch
TitleEROSION INSPECTOR
Phone #789-3996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-01253 General Inspection6/9/20176/9/20176/9/2017 4:13:04 PM CANC
ESC16-01202 Aging Inspection6/9/20176/9/20176/9/2017 4:12:58 PM CANC
ESC15-01091 General Inspection6/9/20176/9/20176/9/2017 4:12:52 PM CANC
ESC15-00094 General Inspection6/9/20176/9/20176/9/2017 4:12:46 PM CANC
ESC16-00945 General Inspection6/9/20176/9/20176/9/2017 4:12:39 PM CANC
ESC16-01633 BMP Violation6/6/20176/9/20176/9/2017 4:12:28 PMAPART
Trash containment has been provided on pheasant tail way and most trash has been cleaned up. There is still some windblown trash in natural area that needs to be cleaned.
ESC13-01279 General Inspection6/6/20176/9/20176/9/2017 4:12:19 PMAPART
Okay to start homes on Caddis way. Silt fence installed along perimeter. Needs to improve both entrances to prevent trackout.

Trash containment has been provided on pheasant tail way and most trash has been cleaned up. There is still some windblown trash in natural area that needs to be cleaned.
ESC17-00352 Site Preparation6/9/20176/9/20176/9/2017 4:11:15 PMPPASS
Okay to start.

Clint Phone #: ###-####
ESC17-00610 Site Preparation6/6/20176/9/20176/9/2017 4:10:56 PMAPART
Okay to start. Silt fence installed along perimeter. Needs to improve both entrances to prevent trackout.
ESC15-00853 Conference6/8/20176/9/20176/9/2017 10:19:07 AMAPASS
9:30 Conference. Met GC Ron on site to discuss corrections. Follow ups for correction compliance scheduled for 6/15/2017
ESC16-01275 Site Final5/26/20176/9/20176/9/2017 9:16:27 AMPPASS
Soil is stable. okay to final.
ESC16-00434 General Inspection6/9/20176/9/20176/9/2017 9:08:22 AM PEND
ESC16-00938 General Inspection6/9/20176/9/20176/9/2017 8:00:50 AM CANC