Inspections for the day of: Friday, July 7, 2017.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMelissa Jannusch
TitleEROSION INSPECTOR
Phone #789-3996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-01579 Complaint Inspection7/7/20177/7/20177/7/2017 4:49:00 PMPFAIL
Corrections:
Clean curb and gutters and inlets
Install DI bags
Sweep parking lot. Clean oil spill on parking lot.
Use concrete washouts.
Corrections issued to GC on duty.
Follow up set for Monday afternoon
Conference with RP and GCs scheduled for next week to go over more less urgent corrections.
ESC16-00941 General Inspection7/7/20177/7/20177/7/2017 4:31:03 PM PASS
ESC17-00292 Site Preparation7/7/20177/7/20177/7/2017 4:11:09 PMPNR
Need to
1) sweep up alley way and south side of trail wind
2) clean up uncontained trash before starting
Issued corrections to RP
Follow up for monday afternoon.

Joey Phone #: ###-####
ESC17-00291 Site Preparation7/7/20177/7/20177/7/2017 4:09:41 PMPNR
Need to
1) sweep up alley way and south side of trail wind
2) clean up uncontained trash before starting
Issued corrections to RP
Follow up for monday afternoon.

Joey Phone #: ###-####
ESC17-00290 Site Preparation7/7/20177/7/20177/7/2017 4:09:25 PMPNR
Need to
1) sweep up alley way and south side of trail wind
2) clean up uncontained trash before starting
Issued corrections to RP
Follow up for monday afternoon.

Joey Phone #: ###-####
ESC17-00285 Site Preparation7/7/20177/7/20177/7/2017 4:09:12 PMPNR
Need to
1) sweep up alley way and south side of trail wind
2) clean up uncontained trash before starting
Issued corrections to RP
Follow up for monday afternoon.
ESC17-00285 Site Preparation7/7/20177/7/20177/7/2017 4:09:00 PMPNR
Need to
1) sweep up alley way and south side of trail wind
2) clean up uncontained trash before starting
Issued corrections to RP
Follow up for monday afternoon.
Joey Phone #: ###-####
ESC16-01386 Site Final7/6/20177/7/20177/7/2017 4:06:34 PMANR
DI been removed. Trash and parking lot need to be swept. Talked with RP onsite. Plans to be done by next week. rescheduled for wednesday.

Check that temporary DI bag has been removed.
site contact Jose w/ Mcalvain ###-####
ESC16-01139 Aging Inspection7/7/20177/7/20177/7/2017 9:23:44 AM CANC
ESC16-01432 General Inspection7/7/20177/7/20177/7/2017 9:23:35 AM CANC
ESC16-01204 General Inspection7/7/20177/7/20177/7/2017 9:23:29 AM CANC
ESC16-01355 General Inspection7/7/20177/7/20177/7/2017 9:23:24 AM CANC
ESC17-00505 Site Preparation7/7/20177/7/20177/7/2017 9:20:00 AMPPASS
okay to start

Clint Phone #: ###-####
ESC17-00404 General Inspection7/6/20177/7/20177/7/2017 8:53:35 AMPPASS
Water truck is controlling dust on the site and on the road. There is a small amount of local dust but no fugitive dust. There is some trackout due to wetting of the road for dust control but it is contained to the asphalt track pad and not reaching the main road. A gravel haul road is being installed in the next few days.

No dust violations observed on site.
ESC17-00576 Site Preparation7/6/20177/7/20177/7/2017 8:08:49 AMAPASS
Okay to start

Phone #: ###-#### Inspection requested via web by Braxton Hansen
ESC16-01187 General Inspection7/7/20177/7/20177/7/2017 8:08:25 AM CANC