Inspections for the day of: Thursday, January 11, 2018.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-01410 General Inspection1/11/20181/11/20181/12/2018 1:30:29 PM CANC
ESC16-01006 General Inspection1/11/20181/11/20181/11/2018 2:49:23 PM PASS
Majority of neighborhood is clean. Some individual lots are a mess, Working with individual builders to get things taken care off.
ESC17-01527 General Inspection1/11/20181/11/20181/11/2018 2:44:49 PMPFAIL
Gravel on sidewalk and road. Washout on side of lot. No permit sign. Left message with RP. Will schedule follow up.
ESC15-00957 General Inspection1/11/20181/11/20181/11/2018 2:07:29 PM PASS
One home being built, rest of phase has final stabalization. Called Jim Conger and let him know he can pull out inlet protection. Once BMPs are removed permit can be closed.
ESC17-00207 Aging Inspection1/11/20181/11/20181/11/2018 2:00:33 PM CANC
ESC17-00207 DOC - Permit Finaled1/11/20181/11/20181/11/2018 2:00:24 PMPPASS
ESC17-00151 Aging Inspection1/11/20181/11/20181/11/2018 1:50:38 PM PASS
Home complete and yard landscaped. Lot next door is bare.
ESC16-00948 General Inspection1/11/20181/11/20181/11/2018 1:41:13 PM PASS
One vacant lot remaining. Some dirt on road, must of been tracked in since it is in area without disturbance.
ESC18-00019 Site Preparation1/10/20181/11/20181/11/2018 12:09:08 PMPPASS
Currently contractor is marking out utilities. Area will need inlet protection on road.
ESC17-01200 General Inspection1/4/20181/11/20181/11/2018 11:31:59 AMPPASS
Site is graded so all water stay on. No trackout at time of inspection. Washout and stable entrance on site. No loose trash. Only concern is some secondary containment for form oils. Talked to superintendent while on site.
ESC17-00138 General Inspection1/11/20181/11/20181/11/2018 10:39:37 AMPPASS
WIP. Stockpiles on site. Dirt on Pasadena, some is from recent utility trenching. Owyhee is free from trackout. DI has blocksomm and witches hat. Fueling truck was on site, has all spill control and cleanup on board.
ESC17-00011 General Inspection1/11/20181/11/20181/11/2018 10:17:06 AMPPASS
Area atround hotel is landscaped and paved. Some trackout onto elder from suppliers picking up materials. Walked site with Tyler and he will get gutters and road cleaned.
ESC17-00404 General Inspection1/11/20181/11/20181/11/2018 10:15:49 AMPPEND
Talked to Tyler while on site. Planning on seeding staging lot as soon as it is warm enough, probably early March. Trackout is coming from Elder, supplier drove truck in to pick up material. They are done with storage lot. They will clean road and gutters when truck leaves site. Neighbor is concerned about drainage into his house. They will monitor it and make adjustments to grading as needed. Advised to keep record and take pictures to have proof if issues arise. At time there is no runoff leaving old staging area, some existing grass and buffer still exist.