Inspections for the day of: Tuesday, January 15, 2019.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-00975 General Inspection1/15/20191/15/20191/16/2019 10:34:33 AMPPASS
Home completed and landscaped.
ESC18-00492 General Inspection1/15/20191/15/20191/16/2019 10:22:33 AMPPASS
Ite surrounded with fencing and K-rail. Inlets on Franklin protected with witches hats. Garbage trailer on site and used. Circular access road is completely rocked. No issues observed at time of inspection.
ESC18-00359 General Inspection1/15/20191/15/20191/16/2019 10:09:27 AMPCANC
ESC18-00786 General Inspection1/15/20191/15/20191/16/2019 10:03:51 AMPPASS
WIP on interiors, permit on window. No visible dirt leaving site, area snow covered at time of inspection.
ESC18-00708 General Inspection1/15/20191/15/20191/16/2019 10:03:37 AMPPASS
WIP on interiors, permit on window. No visible dirt leaving site, area snow covered at time of inspection.
ESC18-01331 General Inspection1/15/20191/15/20191/16/2019 9:49:23 AMPPASS
Foundations completed on two row homes. Some building material on site, no work. No dirt leaving site.
ESC18-01330 General Inspection1/15/20191/15/20191/16/2019 9:49:10 AMPPASS
Foundations completed on two row homes. Some building material on site, no work. No dirt leaving site.
ESC18-00455 Site Final1/15/20191/15/20191/16/2019 9:43:22 AMPPASS
ESC18-00459 General Inspection1/15/20191/15/20191/16/2019 9:43:06 AMPCANC
ESC18-01140 Site Final1/15/20191/15/20191/16/2019 9:39:53 AMPPASS
ESC17-00138 Site Final1/14/20191/15/20191/16/2019 9:30:22 AMPPASS
ESC18-01366 Tracking Control1/11/20191/15/20191/16/2019 9:22:30 AMPDEFR
Road has been snow covered past few days, not possible to determine if trackout has been cleared.
ESC18-01289 General Inspection1/8/20191/15/20191/15/2019 11:12:40 AMAPASS
Not much activity, were changes in building plans and are still in review. Probably two weeks before Dasco starts disturbances for utilitie work. Shotcrete wall is being installed, two eco pans on site.
Sweepers are being used as needed.
ESC16-01650 General Inspection1/15/20191/15/20191/15/2019 9:42:05 AMPPASS
Site is clean, met with RP last week, site has regular cleaning schedule. Two lots are still empty without foundations, all other foundation completed.
ESC17-01429 Site Final1/15/20191/15/20191/15/2019 9:41:03 AMPNR
Still needs landscaping.
ESC18-00291 Site Final1/15/20191/15/20191/15/2019 9:40:45 AMPNR
Still needs landscaping.
ESC17-01286 Site Final1/15/20191/15/20191/15/2019 9:35:57 AMPPASS