ESC19-00076
| General Inspection | 1/22/2020 | 1/23/2020 | 1/27/2020 9:37:43 AM | P | PASS |
|
|
South entrance is locked, everyone forced to go out pitrun to rock. Area around school paved. Work at site is interior or siding. SOme mud in site from genie lifts, none leaving site. DIs on Pierce still have plenty of room.
|
ESC17-00190
| General Inspection | 1/23/2020 | 1/23/2020 | 1/24/2020 11:18:24 AM | | PASS |
|
|
WIP on two homes. No issues at phase.
|
ESC19-01579
| General Inspection | 1/23/2020 | 1/23/2020 | 1/24/2020 9:14:12 AM | P | PASS |
|
|
Out building stripped. Materials stored in garage of home. Site is clean.
|
ESC19-01711
| General Inspection | 1/23/2020 | 1/23/2020 | 1/23/2020 2:28:57 PM | P | PASS |
|
|
Talked to concrete foreman while at site. Currently setting forms, plan on pouring tommorow. Told him he needs washout or to have it hauled away. Will follow up next week to look for dumped washout. Backfill on site, natural buffer, deep rock entrance.
|
ESC18-01089
| Tracking Control | 1/22/2020 | 1/23/2020 | 1/23/2020 2:11:40 PM | A | PART |
|
|
Area was swept. Concrete crew decided to back trailer into mud. Let RP know.
|
ESC19-01492
| Tracking Control | 1/22/2020 | 1/23/2020 | 1/23/2020 2:11:08 PM | A | PART |
|
|
Can see that it was swept. Crew has mini excavator and is starting to make new mess.
|
ESC18-01698
| Aging Inspection | 1/23/2020 | 1/23/2020 | 1/23/2020 2:03:43 PM | | PASS |
|
|
Work completed outside, still needs landscaping.
|
ESC18-01699
| Aging Inspection | 1/23/2020 | 1/23/2020 | 1/23/2020 2:03:29 PM | | PASS |
|
|
Work completed outside, still needs landscaping.
|
ESC19-01191
| General Inspection | 1/23/2020 | 1/23/2020 | 1/23/2020 1:55:25 PM | P | PASS |
|
|
WIP on framing. Site is clean. Have good traffic plan, no tracking.
|
ESC18-01124
| General Inspection | 1/23/2020 | 1/23/2020 | 1/23/2020 1:36:38 PM | | PASS |
|
|
|
ESC17-00315
| General Inspection | 1/23/2020 | 1/23/2020 | 1/23/2020 1:35:46 PM | | DONE |
|
|
|
ESC19-00542
| General Inspection | 1/23/2020 | 1/23/2020 | 1/23/2020 12:23:02 PM | P | PASS |
|
|
No trackout from either entrance. WIP on vertical. Seepage bed is surrounded by ecology blocks.
|
ESC19-01673
| General Inspection | 1/23/2020 | 1/23/2020 | 1/23/2020 12:00:16 PM | P | PEND |
|
|
Some trackout. Talked to PM and will get a sweeper. Follow up scheduled.
|
ESC19-01053
| Tracking Control | 1/23/2020 | 1/23/2020 | 1/23/2020 11:02:53 AM | P | CANC |
|
|
|
ESC18-01771
| Tracking Control | 1/21/2020 | 1/23/2020 | 1/23/2020 11:00:27 AM | A | FAIL |
|
|
No improvements made. Will start formal NOV
|
ESC18-01769
| Tracking Control | 1/21/2020 | 1/23/2020 | 1/23/2020 11:00:03 AM | A | FAIL |
|
|
No improvements made. Will start formal NOV
|
ESC18-00023
| General Inspection | 1/23/2020 | 1/23/2020 | 1/23/2020 10:37:43 AM | | CANC |
|
|
|
ESC19-01053
| General Inspection | 1/23/2020 | 1/23/2020 | 1/23/2020 10:37:12 AM | P | FAIL |
|
|
Trackout. Talked to PM, is having PSI come do sweeping, hasn't been happy with CCS, will make sure they get gutters. Follow up scheduled
|
ESC19-00278
| Aging Inspection | 1/23/2020 | 1/23/2020 | 1/23/2020 10:10:08 AM | | CANC |
|
|
|
ESC19-00203
| General Inspection | 1/23/2020 | 1/23/2020 | 1/23/2020 10:09:32 AM | P | FAIL |
|
|
Lots of trackout, entrance is compacted and muddy. Someone missed washout or spilled when cleaning, washout in gutter. Pan on site with plenty of capacity. Message sent to RP, follow up scheduled.
|
ESC18-00900
| General Inspection | 1/23/2020 | 1/23/2020 | 1/23/2020 9:45:43 AM | P | PASS |
|
|
No activity, surveyor on site. Some tracking onto lake hazel on north side, coming from gates going to ag land and not construction site.
|
ESC18-01128
| General Inspection | 1/23/2020 | 1/23/2020 | 1/23/2020 9:26:27 AM | | PEND |
|
|
Work has begun on east side. Site manager will forward me approvals to start before permits issued for second phase. Says GRD and old ESC reopened for site.
|