Inspections for the day of: Friday, January 24, 2020.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC19-00574 General Inspection1/23/20201/24/20201/28/2020 12:55:38 PMAPASS
All work on west end. Lander street entrance closed, all coming in off veterans, good rock pad.
Large drill on site, some dewatering from manhole into lined pond, exits to pond/wetland in park. No issues at site.
ESC18-01767 General Inspection1/24/20201/24/20201/27/2020 11:44:57 AM PASS
Exterior completed, driveway poured. Perimeter fence still installed, nothing has left site.
ESC19-00156 BMP Violation1/24/20201/24/20201/24/2020 12:48:23 PMPFAIL
Checked site 1/23. No improvements have been made.
ESC19-01345 General Inspection1/24/20201/24/20201/24/2020 12:14:55 PMPPASS
No current issues. Will need to watch hillside until gutters are installed.
ESC19-00206 General Inspection1/24/20201/24/20201/24/2020 12:07:56 PM PASS
Waiting on stabilization.
ESC19-00611 General Inspection1/24/20201/24/20201/24/2020 11:58:13 AMPFAIL
Site needs trash cleaned up. Message sent to listed rp, follow up scheduled.
ESC19-00702 General Inspection1/24/20201/24/20201/24/2020 11:36:13 AMPPASS
Hillsides hydroseeded and BMPs installed as needed. Lots have been bermed. No issues at site.
ESC19-00994 General Inspection1/24/20201/24/20201/24/2020 11:23:03 AMPPASS
Disturbed area has been hydroseeded and wattle space on hillside. Berm along Bogus Basin road has been installed. Do not see any rills or other issues.
ESC19-00241 General Inspection1/24/20201/24/20201/24/2020 11:09:57 AM PASS
Site is contained, work is inside building. No trackout.
ESC19-00311 General Inspection1/24/20201/24/20201/24/2020 10:52:30 AM PASS
Site is clean. No workers doing any dirt work today. No blowouts anywhere on site.
ESC18-01687 General Inspection1/24/20201/24/20201/24/2020 10:34:46 AM PASS
Revegetation in progress, no esc issues. Parks dept is doing inspections.
ESC19-01494 General Inspection1/24/20201/24/20201/24/2020 10:20:11 AMPPASS
Foundation poured, washout used, most backfill put back.
Will bring more rock for entrance. No current issues.
ESC19-00178 General Inspection1/24/20201/24/20201/24/2020 10:19:25 AM PASS
No issues at site. Waiting for spring to stabilize
ESC19-00324 General Inspection1/24/20201/24/20201/24/2020 9:35:57 AMPFAIL
Track Utilities on site. Trenching along Warm Springs and Teresa. Dirt ramps made on road to get over curbs, lots of dirt and tracking on site.
Poly has been installed along drain to pond to stop rilling.
Some runon to road at top of hill, BMPs installed have been destroyed by being ran over. Berms above still in place, ditch along road has been filled, using area as road, needs new berms at curve on road.
ESC19-00255 Aging Inspection1/24/20201/24/20201/24/2020 9:09:44 AM CANC
ESC19-00255 DOC - Permit Finaled1/24/20201/24/20201/24/2020 9:09:38 AMPPASS
ESC19-00135 General Inspection1/24/20201/24/20201/24/2020 8:35:19 AM PASS