ESC17-00027
| Tracking Control | 1/24/2018 | 1/25/2018 | 1/25/2018 3:28:47 PM | A | PART |
|
|
Sorensen and paved part of entrance have been swept. Talked to RP, sweeper is scheduled for Wednesday nights and as needed. Apron onto Victory still needs to be swept, road is free from trackout. Eastern uphill DI needs protection to catch any mud tracked up with flow of traffic.
|
ESC17-00263
| Aging Inspection | 1/25/2018 | 1/25/2018 | 1/25/2018 3:03:22 PM | | PASS |
|
|
WIP. Permit is posted in back yard. Yard is all exposed, buffer strip remains. No issues with trackout or runoff. Worker on site parked on concrete driveway.
|
ESC17-00383
| General Inspection | 1/25/2018 | 1/25/2018 | 1/25/2018 1:51:29 PM | | PASS |
|
|
No disturbed area. Pile of drywall scraps in parking area, sidewalk along side of building.
|
ESC17-00345
| Aging Inspection | 1/25/2018 | 1/25/2018 | 1/25/2018 12:26:01 PM | | CANC |
|
|
|
ESC17-00345
| DOC - Permit Finaled | 1/25/2018 | 1/25/2018 | 1/25/2018 12:25:50 PM | P | PASS |
|
|
|
ESC17-00382
| General Inspection | 1/25/2018 | 1/25/2018 | 1/25/2018 12:24:39 PM | | PART |
|
|
Rear of property muddy. There is some mud going into alley. No perimeter controls but mud isn't going onto sidewalk. Building is currently boarded up an access is through rear.
|
ESC15-00762
| General Inspection | 1/25/2018 | 1/25/2018 | 1/25/2018 12:11:55 PM | | PASS |
|
|
Majority of work complete. 5th street has been paved and silva cells are installed. Some plastic sheeting and scaffolding on building. Still is a storage yard in use, no dirt being tracked out or garbage blown from site. One lane of 5th and Myrtle still closed.
|
ESC17-01304
| Random Inspection | 1/25/2018 | 1/25/2018 | 1/25/2018 11:54:22 AM | P | PASS |
|
|
Fenced area, nothing leaving site.
|
ESC17-00422
| Random Inspection | 1/25/2018 | 1/25/2018 | 1/25/2018 11:53:38 AM | P | PASS |
|
|
WIP on steel shell. Entrance still in place and road free from track out. Perimeter silt fence installed and still standing. DI installed and clean.
|
ESC17-00201
| Aging Inspection | 1/25/2018 | 1/25/2018 | 1/25/2018 11:05:34 AM | | CANC |
|
|
|
ESC17-00201
| DOC - Permit Finaled | 1/25/2018 | 1/25/2018 | 1/25/2018 11:05:26 AM | P | PASS |
|
|
|
ESC17-00287
| Aging Inspection | 1/25/2018 | 1/25/2018 | 1/25/2018 11:02:44 AM | | CANC |
|
|
|
ESC17-00287
| DOC - Permit Finaled | 1/25/2018 | 1/25/2018 | 1/25/2018 11:02:34 AM | P | PASS |
|
|
|
ESC17-00678
| General Inspection | 1/25/2018 | 1/25/2018 | 1/25/2018 10:54:00 AM | P | PASS |
|
|
check if DI bag on north side of Taboo has been emptied. DIs have been cleaned.
|
ESC17-00352
| DOC - Permit Finaled | 1/25/2018 | 1/25/2018 | 1/25/2018 10:48:31 AM | P | PASS |
|
|
|
ESC17-00322
| General Inspection | 1/25/2018 | 1/25/2018 | 1/25/2018 10:48:13 AM | | PASS |
|
|
|
ESC17-00353
| DOC - Permit Finaled | 1/25/2018 | 1/25/2018 | 1/25/2018 10:45:47 AM | P | PASS |
|
|
|
ESC17-00322
| DOC - Permit Finaled | 1/25/2018 | 1/25/2018 | 1/25/2018 10:45:18 AM | P | PASS |
|
|
|
ESC17-00351
| DOC - Permit Finaled | 1/25/2018 | 1/25/2018 | 1/25/2018 10:40:05 AM | P | PASS |
|
|
|
ESC15-00094
| General Inspection | 1/25/2018 | 1/25/2018 | 1/25/2018 9:41:39 AM | | PASS |
|
|
Mostly complete. Few vacant lots, some homes being built. Neighborhood is clean. Home builders are responsible for their own sites.
|
ESC17-00791
| General Inspection | 1/12/2018 | 1/25/2018 | 1/25/2018 9:40:10 AM | P | PART |
|
|
Work has begun on grading and clearing boulders. Entrance,gravel bags in gutter, wattle, and silt fence installed. A few sections of fence have been broken or knocked over, I let Eric the RP know. Site is free from trackout and clean.
|
ESC17-01749
| Random Inspection | 1/25/2018 | 1/25/2018 | 1/25/2018 9:25:18 AM | P | PASS |
|
|
Superior Blasting on site. No trackout leaving site. Stockpiled dirt on side of property.
|