Inspections for the day of: Friday, January 26, 2018.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-01278 Tracking Control1/23/20181/26/20181/29/2018 10:30:47 AMACANC
ESC17-00360 Aging Inspection1/26/20181/26/20181/26/2018 1:25:34 PM CANC
ESC17-00360 DOC - Permit Finaled1/26/20181/26/20181/26/2018 1:25:25 PMPPASS
ESC17-00406 General Inspection1/26/20181/26/20181/26/2018 1:10:04 PM PEND
Two corrections issued vebally.
McAlvain has an overflowing Eco-pan, asked them to have it replaced.
DI in 10th street unprotected and receiving runoff from site, Asked CM company to get it taken care of.
ESC17-00446 Aging Inspection1/26/20181/26/20181/26/2018 11:53:12 AM PASS
Addition looks complete. Lot has been landscaped but nothing is growing yet.
ESC17-00407 General Inspection1/26/20181/26/20181/26/2018 11:28:18 AM CANC
ESC17-00407 DOC - Permit Finaled1/26/20181/26/20181/26/2018 11:28:08 AMPPASS
ESC16-00948 General Inspection1/26/20181/26/20181/26/2018 11:22:10 AM PASS
Some dirtwork has started on final lot. No permit sign posted. No trackout leaving site.
ESC17-00439 Aging Inspection1/26/20181/26/20181/26/2018 11:15:53 AM PEND
Follow up already scheduled 1/29
ESC17-00441 Aging Inspection1/26/20181/26/20181/26/2018 10:41:20 AM PASS
Addition complete. Landscaping completed, waiting for growth and final stabalization.
ESC17-01767 Site Preparation1/25/20181/26/20181/26/2018 10:34:25 AMAPASS
Talked to excavator on site. Very minimal depth so ground water not an issue. Left a permit sign with him. Trying to get dirt work done before rains come back in.
ESC15-00957 General Inspection1/26/20181/26/20181/26/2018 10:18:11 AM PASS
One remaining home. Talked to developer a few weeks ago, soon as witches hats removed I will close permit.
ESC16-01006 General Inspection1/26/20181/26/20181/26/2018 10:11:45 AM PASS
Most homes completed, few WIP. Neighborhood BMPs for the DIs. Few lots are dirty, individual builders responsible for their own. No trackout or major violation noted. Lot's of workers onsite at other phases.
ESC16-01410 General Inspection1/26/20181/26/20181/26/2018 8:31:07 AM CANC