ESC18-00175
| Aging Inspection | 1/29/2020 | 1/29/2020 | 1/29/2020 2:19:50 PM | | PASS |
|
|
Garage is all framed, contained, no issues.
|
ESC19-01545
| General Inspection | 1/29/2020 | 1/29/2020 | 1/29/2020 12:45:20 PM | P | PASS |
|
|
WIp on framing and interior. Two vehicles parked on site, drive is pit run but still some mud. Plywood walking paths leading to garbage bin.
|
ESC18-01636
| General Inspection | 1/29/2020 | 1/29/2020 | 1/29/2020 12:38:44 PM | | PASS |
|
|
Met with Rex at site. Starting to strip and stockpile on south of Warm Spring. They are getting the bench stripped and plan to grade a few feet above water table. Will not start well points or dewatering until next week.RP supposed to get site prep scheduled before excavation work. North side concrete work has begun on east edge of area, will be the alley behind homes. Washout is being used, some tracking, getting cleaned as occurs, power broom at site. Currently hauling away brush and fill from behind Shakesphere, want to get road done.
|
ESC19-01724
| BMP Violation | 1/29/2020 | 1/29/2020 | 1/29/2020 12:14:43 PM | P | FAIL |
|
|
Met with Kyle at site. Backfill and mud all over road. Front end loader driven out of site and tracked down road to be loaded.
|
ESC18-00020
| General Inspection | 1/29/2020 | 1/29/2020 | 1/29/2020 12:12:33 PM | P | PASS |
|
|
All of Harris North except Foxgrove is clean. Was swept today, had syman out to do maintenance.
|
ESC18-01089
| General Inspection | 1/29/2020 | 1/29/2020 | 1/29/2020 12:11:46 PM | P | FAIL |
|
|
Met with Kyle while at site. Had streets swept this morning. Crew doing backfill has already trashed road(6073 Foxgrove). Drove front end loader a few hundred yard down road to lad, tracking whole way. Backfill in front of home all over road and sidewalk.
|
ESC19-00520
| General Inspection | 1/29/2020 | 1/29/2020 | 1/29/2020 12:01:35 PM | | PASS |
|
|
|
ESC19-00520
| DOC - Permit Finaled | 1/29/2020 | 1/29/2020 | 1/29/2020 12:01:25 PM | P | PASS |
|
|
|
ESC19-00509
| General Inspection | 1/29/2020 | 1/29/2020 | 1/29/2020 11:51:12 AM | P | PASS |
|
|
Met with foreman on site. Hoping to get plumbing done and inspected so they can pour floor. Washout on site, no issues.
|
ESC19-01069
| General Inspection | 1/29/2020 | 1/29/2020 | 1/29/2020 11:29:40 AM | P | PASS |
|
|
Pad area prepped, no current activity.
|
ESC17-00791
| General Inspection | 1/29/2020 | 1/29/2020 | 1/29/2020 11:18:08 AM | | PASS |
|
|
No activity, no blowout to lots below.
|
ESC19-00032
| Aging Inspection | 1/29/2020 | 1/29/2020 | 1/29/2020 11:17:41 AM | | PASS |
|
|
Landscapers currently on site.
|
ESC19-00402
| General Inspection | 1/29/2020 | 1/29/2020 | 1/29/2020 11:00:45 AM | | FAIL |
|
|
One person backed onto site and tracked down E Hays Way. Every other worker is parked on road. Overall site clean. No listed rp, message sent to owner, follow up scheduled.
|
ESC19-00114
| General Inspection | 1/29/2020 | 1/29/2020 | 1/29/2020 10:44:22 AM | P | DONE |
|
|
Met with neighbor on site. Will forward pictures and videos. Heard from builder and are waiting for some plan mods.
|
ESC18-01002
| General Inspection | 1/29/2020 | 1/29/2020 | 1/29/2020 9:24:09 AM | | PASS |
|
|
Project has been halted. No runoff or any issues at site.
|
ESC18-01636
| General Inspection | 1/29/2020 | 1/29/2020 | 1/29/2020 8:53:51 AM | P | CANC |
|
|
|
ESC18-01584
| Site Preparation | 1/22/2020 | 1/29/2020 | 1/28/2020 9:45:35 AM | A | PASS |
|
|
All corrections completed.
|
ESC19-01711
| General Inspection | 1/23/2020 | 1/29/2020 | 1/28/2020 9:16:30 AM | A | PASS |
|
|
Check if washout used. No dumped washout, looks like they hauled away. Talked to neighbor said they poured Thursday, truck was in front. No spills.
|