ESC19-00672
| Tracking Control | 1/2/2020 | 1/3/2020 | 1/6/2020 2:12:02 PM | A | FAIL |
|
|
Trackout. Met with foreman about getting a sweeper and maybe installing pit run around building.
|
ESC19-00264
| Site Final | 1/3/2020 | 1/3/2020 | 1/6/2020 10:28:42 AM | P | NR |
|
|
Di protection still installed. Contacted Ben Evan to get it removed.
|
ESC19-00356
| Site Final | 12/19/2019 | 1/3/2020 | 1/6/2020 10:01:05 AM | P | PASS |
|
|
|
ESC18-01244
| General Inspection | 1/3/2020 | 1/3/2020 | 1/3/2020 1:15:08 PM | | FAIL |
|
|
Sidewalk not clean, gator guard not repaired.
|
ESC19-00320
| Aging Inspection | 1/3/2020 | 1/3/2020 | 1/3/2020 12:00:46 PM | | CANC |
|
|
|
ESC19-00320
| DOC - Permit Finaled | 1/3/2020 | 1/3/2020 | 1/3/2020 12:00:40 PM | P | PASS |
|
|
|
ESC19-00301
| Aging Inspection | 1/3/2020 | 1/3/2020 | 1/3/2020 11:53:10 AM | | PASS |
|
|
WIP. All activity within fenced off IDP yard.
|
ESC19-00283
| General Inspection | 1/3/2020 | 1/3/2020 | 1/3/2020 11:43:39 AM | | PASS |
|
|
Still fenced off.
|
ESC18-01447
| General Inspection | 1/3/2020 | 1/3/2020 | 1/3/2020 11:43:17 AM | | PASS |
|
|
No workers on site. All material on lot, no loose trash. Hillside is stable.
|
ESC18-01022
| General Inspection | 1/3/2020 | 1/3/2020 | 1/3/2020 11:28:36 AM | | FAIL |
|
|
Muddy entrance to washout. Lots of trackout. RP already knows, Collin was supposed to have ordered rock and be up today to clean. Lots have been bermed, plan on hydroseeding behind sidewalks.
|
ESC19-00076
| General Inspection | 1/3/2020 | 1/3/2020 | 1/3/2020 10:39:29 AM | | PASS |
|
|
Northern entrance off of Pierce is closed. arking lot around school paved, lots of trackon fromn lifts, no leaving site. Trash is cleaned up, dumpsters in muddy area.
|
ESC19-00247
| Aging Inspection | 1/3/2020 | 1/3/2020 | 1/3/2020 10:10:26 AM | | PASS |
|
|
All work contained up in lot, no tracking to Franklin.
|
ESC19-01764
| General Inspection | 1/3/2020 | 1/3/2020 | 1/3/2020 10:09:47 AM | P | PASS |
|
|
Mini ex on site just beginning around home. Large buffer before road.
|
ESC18-01304
| General Inspection | 1/3/2020 | 1/3/2020 | 1/3/2020 9:44:35 AM | P | PASS |
|
|
Building is completed. Driveway not connected to street, not landscaped, still some stockpiled soil.
|
ESC19-00100
| Site Final | 1/2/2020 | 1/3/2020 | 1/3/2020 9:40:45 AM | P | PASS |
|
|
|
ESC19-01049
| General Inspection | 1/3/2020 | 1/3/2020 | 1/3/2020 9:39:52 AM | P | PART |
|
|
Stockpile is east of work area and past the end of installed BMPs. Masons on site, mortar mixer has secondary containment, some slurry from saw cutting on ground. Parking area is gravel, entrance installed. No trackout, inlet protection installed.
|
ESC18-01015
| Aging Inspection | 1/3/2020 | 1/3/2020 | 1/3/2020 9:24:25 AM | | PASS |
|
|
Shell completed. Has pit run around it, no esc issues.
|