Inspections for the day of: Thursday, January 30, 2020.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-01053 Site Final1/27/20201/30/20202/3/2020 11:18:10 AMPPASS
All homes completed and stable, all individual esc permits closed.
Still some workers coming and going at site.
ESC19-00404 Aging Inspection1/30/20201/30/20201/30/2020 1:38:05 PM CANC
ESC19-00404 DOC - Permit Finaled1/30/20201/30/20201/30/2020 1:37:56 PMPPASS
ESC16-00353 General Inspection1/30/20201/30/20201/30/2020 1:30:45 PM PASS
No new construction, no failures or issues at any lots.
ESC19-00402 Tracking Control1/29/20201/30/20201/30/2020 12:15:11 PMAPASS
Steet cleaned, gator guard reinstalled.
ESC19-00525 General Inspection1/30/20201/30/20201/30/2020 12:08:51 PM PASS
Site is muddy inside, no tracking. DIs on Park Center clean. No loose trash or messes. No contanimated areas on site. Concrete washouts in use.
ESC19-00524 General Inspection1/30/20201/30/20201/30/2020 12:08:32 PM PASS
Site is muddy inside, no tracking. DIs on Park Center clean. No loose trash or messes. No contanimated areas on site. Concrete washouts in use.
ESC19-00312 Aging Inspection1/30/20201/30/20201/30/2020 11:31:57 AM CANC
ESC19-00312 DOC - Permit Finaled1/30/20201/30/20201/30/2020 11:31:45 AMPPASS
ESC19-00545 General Inspection1/30/20201/30/20201/30/2020 10:55:58 AM CANC
ESC19-00544 General Inspection1/30/20201/30/20201/30/2020 10:55:47 AM CANC
ESC19-00545 DOC - Permit Finaled1/30/20201/30/20201/30/2020 10:55:37 AMPPASS
ESC19-00544 DOC - Permit Finaled1/30/20201/30/20201/30/2020 10:55:28 AMPPASS
ESC19-01262 General Inspection1/30/20201/30/20201/30/2020 10:38:18 AMPPASS
No current activity, some concrete walls completed, form trailer still out front. Rear has no BMPs at hillside, lower right looks like it may get all water, no issues yet.
ESC19-01457 Site Preparation1/29/20201/30/20201/30/2020 10:27:52 AMAPASS
Met foreman at site. Will install wattle along back and side perimeter. Will put snake bags in gutter, DIs are down hill and already protected. Will not start for a few weeks. The concrete is scheduled out and they don't want to leave a hole exposed while waiting.
ESC19-00396 BMP Violation1/27/20201/30/20201/30/2020 10:26:26 AMAFAIL
No cleeanup. Will start NOV.